A stronger roof structure is mandatory: tiles weigh about five times what sheet does. Used on
ColumnsMeasured work · Superstructure
Reinforced concrete columns, all of the same section. Used on
Compacted earth and screedSpecification choice · Ground floor
Earth rammed in layers, then a 40 mm mortar screed. Half the rural building stock sits on this. No reinforced slab and therefore no steel: it is the cheapest ground floor there is. It absolutely requires a membrane under the screed, or damp rises and lifts everything laid on top of it. Used on
Compressed stabilised earth blockSpecification choice · Wall construction
Cheap and climate-appropriate, but weak in compression and water-sensitive: needs a roof overhang and a masonry plinth. Used on
Far quieter under rain than steel and much cooler in sun, since it does not radiate heat into the room. Against that it is heavy and brittle: it needs a denser roof structure and nobody should walk on it. Check it is asbestos-free, because older or grey-import sheets still contain it. Used on
Design, drawings and permitsWork package
Architect, working drawings, soil survey and building permit. Used on
Direct lorry accessSpecification choice · Site access
Sockets, lighting points and the board. Where the power comes from is chosen in the budget estimate. Used on
EN 12056-3Standard · Gravity drainage systems inside buildings, part 3: roof drainage
Sizing gutters and downpipes from the roof area and the rainfall intensity. Used on
EN 13707Standard · Reinforced bitumen sheets for roof waterproofing
Two-layer SBS waterproofing on a flat slab, with 150 mm upstands. Used on
EN 13967Standard · Plastic and rubber damp proof sheets, including basement tanking
Polythene sheet under the ground slab against rising damp from the soil. Used on
EN 13969Standard · Bitumen damp proof sheets, including basement tanking
Bituminous membrane under a raft, in a high water table or a basement. Used on
EN 14891Standard · Liquid applied water impermeable products for use beneath tiling
Tanking slurry in wet rooms, applied before tiling. Used on
EN 14967Standard · Bitumen damp proof courses
Damp proof course bedded into the wall 150 mm above finished ground. Used on
EN 1504-2Standard · Surface protection systems for concrete
Liquid applied waterproof coating on a flat roof. Used on
EN 1990Standard · Basis of structural design
Load combinations and partial factors: 1.35 on permanent actions, 1.5 on variable ones. Used on
EN 1991-1-1Standard · Actions on structures: densities, self-weight and imposed loads
Material densities and imposed loads by occupancy category, which is what makes the sizing follow the building’s use. Used on
EN 1992-1-1Standard · Design of concrete structures
Slabs, beams, columns and footings: span/depth ratios, flexure with the 0.167 balanced limit, shear per §6.2.2, bar spacing per §8.2, minimum steel per §9.2.1.1 and §9.3.1.1. Used on
EN 1993-1-1Standard · Design of steel structures
Steel beams and columns: plastic moment resistance §6.2.5, flexural buckling §6.3.1 on curve b, and deflection capped at L/250. Used on
EN 1995-1-1Standard · Design of timber structures
Floor joists: f_m,d = k_mod · f_m,k / γ_M with k_mod 0.8 in service class 2, and deflection capped at L/300. Used on
EN 1996-1-1Standard · Design of masonry structures
Characteristic strength f_k = K·f_b^0.7·f_m^0.3 (§3.6.1.2), slenderness capped at 27 (§5.5.1.4) and vertical load resistance (§6.1.2). Used on
EN 1997-1Standard · Geotechnical design
Bored piles: set R4 partial factors (γ_b 2.0, γ_s 1.6), no load testing. The weakest calculation in the tool, and flagged as such. Used on
EN 206Standard · Concrete: specification, performance, production and conformity
Exposure classes. The XF freeze-thaw classes are explicitly excluded: water does not freeze in a structure here, and carrying them would add cover and cement for nothing. Used on
EN 338Standard · Structural timber: strength classes
C24, D30 and D40 classes: characteristic bending strength and mean modulus. Used on
EN 771Standard · Aggregate concrete masonry units
Normalised unit strength f_b and unit group, which set the K factor in EN 1996. Used on
External worksWork package
Yard, driveway, drainage, water and power connections at the plot boundary. Used on
Fair-faced block, no renderSpecification choice · Wall finish
The first line dropped when a budget tightens. It demands careful blockwork and struck joints, and the wall stays porous: avoid it on an elevation that takes driven rain. Used on
Driven entirely by the ground. On sandy, sloping or low-lying sites a soil survey is not optional. Used on
Galvanised sheetSpecification choice · Roof
The most widespread solution in the DRC: light, quick to fix, cheap. Used on
Gas water heaterSpecification choice · Hot water
Instant, and independent of both the grid and the generator, which is its main attraction here. You still have to handle the bottles, and proper ventilation is not optional. Used on
Gentle slopeSpecification choice · Site conditions
For wall ends, window reveals and closing courses. Used for a whole wall it takes twice the units of a 400 mm block, so a dearer wall and twice the joints. Used on
For wall ends, window reveals and closing courses. Used for a whole wall it takes twice the units of a 400 mm block, so a dearer wall and twice the joints. Used on
Hot waterMeasured work · Finishes
Hot water, sized on the number of people. Solar costs more to buy and nothing to run. Used on
How the work is deliveredSpecification choice
Self-building saves the contractor’s margin, at the cost of your time and the risk. Used on
The commonest glazing in this climate: adjustable blades, permanent ventilation without opening up, and a broken blade costs a few dollars to replace. They seal badly, though, and they lift out from outside. Used on
Made ground or old fillSpecification choice · Site conditions
Many urban plots are old gullies that were tipped into. You dig down to natural ground or you pile, and without a soil test you do not know how deep. This is the case that most justifies an investigation. Used on
Main contractorSpecification choice · How the work is delivered
Preparation, primer, internal and external paint, final clean. Used on
PavingMeasured work · External works
Yard, drive or apron, concrete on a gravel sub-base. Used on
Piers or pilesSpecification choice · Foundation type
Very poor ground or a high water table: go down to find bearing. Used on
PilesMeasured work · Substructure
Bored piles. Without a borehole log this is an order of magnitude only: capacity depends on the ground profile with depth, which this tool does not know. Used on
Plant and equipmentCost group
Equipment hired or written down on site, and the fuel that runs it. Used on
Plaster, screed and floor finishesWork package
Internal and external plaster, screeds, floor tiling and wall tiling. Used on
PlumbingMeasured work · Finishes
Water points and sanitary ware. A mains connection is not included: most plots do not have one. Used on
Plumbing and sanitary wareWork package
Supply and waste pipework, septic tank, sanitary fittings, water tank. Used on
RICS NRM 1Standard · Order of cost estimating and cost planning for capital building works
What the estimator does: an elemental cost per m², before the project is drawn. Used on
RICS NRM 2Standard · Detailed measurement for building works
What the bill of quantities does: measurement, once the dimensions are known. The rule that the two must be cross-checked comes from here. Used on
Rocky groundSpecification choice · Site conditions
Excellent bearing, but every cubic metre of excavation is broken out with a breaker or a sledge. The earthworks can cost more than the footings that go in them. Used on
RoofSpecification choice
A flat slab lets you add a storey later, but costs close to double a sheet roof. Used on
Roof coveringMeasured work · Roof
Structure and covering, from the plan area and the pitch. Used on
Roof structure and coveringWork package
Timber or steel roof structure, sheet or tile covering, gutters and downpipes. Used on
Rubble stone footingMeasured work · Substructure
Mortared stone laid in the trench. No reinforcement and no formwork: the width is limited by the 45° load spread, so a wide footing is necessarily a deep one. Used on
Rubble stone footingsSpecification choice · Foundation type
A trench filled with mortared stone. No reinforcement, so the width is limited by the 45° load spread and a wide footing is necessarily a deep one. Common where stone is local and cement is dear. Used on
SanitationSpecification choice
There is almost no sewer network in the DRC: a septic tank is the rule. Used on
Septic tank and soakawayMeasured work · External works
A masonry tank and a drainage field, sized to EN 12566-1. It is the soakaway that fails, and it fails because nobody sized it. Used on
Sewer connectionSpecification choice · Sanitation
Rare, only in a few central neighbourhoods. Used on
Reinforced concrete cast in the trench, under the load-bearing walls. Used on
Strip footingsSpecification choice · Foundation type
Stable bearing ground. The most common solution in the DRC. Used on
Structural steel frameMeasured work · Superstructure
Steelwork, measured by mass. Fabrication and erection weigh more than the steel itself. Used on
Structural systemSpecification choice
A column-and-beam frame is the norm above one storey, or wherever you want large openings. Used on
Sun-dried earth brick (adobe)Specification choice · Wall construction
The commonest rural construction and the cheapest there is: the material is underfoot. Very weak in compression and destroyed by water, so a generous roof overhang and a hard plinth are not optional. A well-protected adobe wall lasts generations; a badly protected one does not survive two rainy seasons. Used on
Supervised self-buildSpecification choice · How the work is delivered
You buy the materials and pay each trade directly. Used on
Surface drainageMeasured work · External works
A masonry channel round the plot. Not a comfort: roof water nobody channelled is what undermines a footing. Used on
Neat finish, recessed lighting, space for services. Used on
Suspended slabMeasured work · Superstructure
Reinforced concrete floor or roof terrace. Used on
Tanker-delivered storageSpecification choice · Water supply
No borehole possible: large storage and a high running cost. Used on
Textured renderSpecification choice · Wall finish
Hides imperfections and weathers better on façades. Used on
ThatchSpecification choice · Roof
Cheapest and coolest: thatch insulates far better than a metal sheet. But it burns, it houses vermin and it is redone every five to eight years. Budget the renewal, not just the first roof. Used on
Timber floorSpecification choice · Upper floors
Light and quick, but termite-prone unless treated. Used on
Tinted or reflective glazingSpecification choice · Glazing
Cuts solar gain, and with it the cooling load. On a west elevation it pays for itself in electricity long before it wears out. Used on
Transport and deliveryCost group
Getting materials to site, including the last kilometre, which is often the dearest. Used on
Upper floorsSpecification choice
Only applies to buildings with more than one storey. Used on
Raised, ventilated floor: essential on damp ground. Used on
Ventilation and coolingSpecification choice
A good ceiling and cross-ventilation often beat an undersized air-conditioning system. Used on
Very difficult accessSpecification choice · Site access
Landlocked plot: handling becomes a cost line of its own. Used on
Wall constructionSpecification choice
The 15 cm block is the DRC load-bearing standard. The 10 cm block is for partitions only. Used on
Wall finishSpecification choice
Wet-room tiling is counted separately from the general wall treatment. Used on
Water supplySpecification choice
The public network is intermittent in most neighbourhoods: plan for storage. Used on
Wet or flood-proneSpecification choice · Site conditions
Fill, drainage and a raised floor are mandatory. Used on
Every definition is the one already sitting beside the term in the engine, not a second version written alongside it: correcting one corrects the other.