Bands in dollars, converted at each country pack’s own rate. “Sourced”: the line comes from a published figure whose link is on that market’s page. “Derived”: computed from a sourced line, with the arithmetic written out. “Estimated”: our estimate, with its basis written out. Spread is the width of the band, not a trend. Actual prices vary by city, supplier and negotiation.
96 lines compared of 97 the pack carries · CDF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $21 – $64.6 | 67% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $4.2 – $10.5 | 60% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $8.8 – $27 | 67% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.6 – $4.5 | 64% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $5.4 – $18 | 70% | |
| Exterior paint (20 L drum)per drumESTIMATED | $46 – $108 | 57% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $24 – $64 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $35 | 77% | |
| Electrical point, surface mountedper pointESTIMATED | $7 – $11 | 36% | |
| Ridge capping (pre-folded)per metreESTIMATED | $8 – $12 | 33% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $12 – $25 | 52% | |
| Gutterper metreESTIMATED | $7 – $18 | 61% | |
| Rainwater downpipeper metreESTIMATED | $5 – $14 | 64% | |
| Supply pipe (PPR ø 25)per metreESTIMATED | $2.5 – $6 | 58% | |
| Waste pipe (PVC ø 110)per metreESTIMATED | $4 – $11 | 64% | |
| Stair balustradeper metreESTIMATED | $45 – $160 | 72% | |
| Skirtingper metreESTIMATED | $3 – $9 | 67% | |
| Water tank, per litreper litreESTIMATED | $0.1 – $0.3 | 67% | |
| Submersible pumpper unitESTIMATED | $180 – $650 | 72% | |
| Tank tower, per metre of heightper metreESTIMATED | $120 – $380 | 68% | |
| Burglar barper m²ESTIMATED | $28 – $75 | 63% | |
| Consumer unit, per wayper wayESTIMATED | $14 – $38 | 63% | |
| Earth electrodeper installationESTIMATED | $55 – $160 | 66% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $6 – $14 | 57% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.5 – $4 | 63% | |
| Solar water heater, per litreper litre of capacityDERIVED | $3.5 – $10 | 65% | |
| Gas instantaneous water heaterper applianceESTIMATED | $120 – $350 | 66% | |
| PVC ceiling panellingper m²ESTIMATED | $6 – $14 | 57% | |
| Plasterboard, 13 mmper m²DERIVED | $9 – $20 | 55% | |
| Generator, per kVAper kVADERIVED | $220 – $1,400 | 84% | |
| Solar photovoltaic, per Wpper WpDERIVED | $0.9 – $1.6 | 44% | |
| Battery, per nominal kWhper kWhDERIVED | $180 – $420 | 57% | |
| Hand-drilled borehole, per metre (to 40 m)per metreSOURCED | $125 – $175 | 29% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreSOURCED | $200 – $400 | 50% | |
| Plumbing point (WC + basin)per pointDERIVED | $190 – $260 | 27% | |
| Sanitary ware (WC pan, basin, taps)per setESTIMATED | $120 – $380 | 68% | |
| Electrical point (socket or light)per pointDERIVED | $9 – $14 | 36% | |
| Steel door with frameper doorESTIMATED | $85 – $220 | 61% | |
| Timber door with frameper doorESTIMATED | $45 – $160 | 72% | |
| Glazed aluminium windowper m²ESTIMATED | $95 – $210 | 55% | |
| Louvre window (naco)per m²ESTIMATED | $35 – $80 | 56% | |
| Grey cement (50 kg bag)per bagDERIVED | $8.5 – $18 | 53% | |
| Steel reinforcement barper tonneSOURCED | $590 – $1,050 | 44% | |
| Structural steel section (IPE, HEA)per tonneESTIMATED | $850 – $1,400 | 39% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.85 – $1.2 | 29% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.55 – $0.8 | 31% | |
| Cement block 20 × 20 × 40eachSOURCED | $1.3 – $1.75 | 26% | |
| Half block 15 × 20 × 20eachDERIVED | $0.51 – $0.72 | 29% | |
| Half block 20 × 20 × 20eachDERIVED | $0.78 – $1.05 | 26% | |
| Hollow block 25 × 20 × 40eachDERIVED | $1.4 – $2 | 30% | |
| Solid block 15 × 20 × 40eachDERIVED | $1.35 – $1.95 | 31% | |
| Compressed stabilised earth blockeachDERIVED | $0.3 – $0.7 | 57% | |
| Fired clay brickeachSOURCED | $0.08 – $0.6 | 87% | |
| Corrugated fibre-cement sheetper sheetESTIMATED | $11 – $18 | 39% | |
| Sun-dried earth brickper brickESTIMATED | $0.05 – $0.12 | 58% | |
| Rubble stoneper m³SOURCED | $22 – $34 | 35% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $1.57 – $4.37 | 64% | |
| Slab proppingper m² of soffitDERIVED | $2.35 – $6.07 | 61% | |
| Setting outper metre of perimeterDERIVED | $0.78 – $2.18 | 64% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $1.18 – $3.64 | 68% | |
| Hand excavation, ordinary groundper m³DERIVED | $3.76 – $7.28 | 48% | |
| Washed crushed sand, Katonto (0/5)per m³SOURCED | $26 – $36 | 28% | |
| River sandper m³SOURCED | $20 – $32 | 38% | |
| Crushed gravelper m³SOURCED | $32 – $50 | 36% | |
| Structural timberper m³SOURCED | $250 – $450 | 44% | |
| Galvanised roofing sheet (2.40 × 0.90 m)per sheetSOURCED | $15 – $25 | 40% | |
| Roof tileeachESTIMATED | $0.8 – $1.8 | 56% | |
| Polythene DPM sheet (300 µm)per m²ESTIMATED | $0.6 – $1.3 | 54% | |
| Damp proof course roll (230 mm)per linear metreESTIMATED | $1.1 – $2.6 | 58% | |
| SBS bitumen membrane, 4 mmper m²ESTIMATED | $9 – $18 | 50% | |
| Liquid waterproof coating (per coat)per m² per coatESTIMATED | $2.2 – $5.5 | 60% | |
| Tanking slurry, per kgper kgESTIMATED | $2.4 – $4.8 | 50% | |
| Floor tilesper m²ESTIMATED | $8 – $30 | 73% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $6 – $14 | 57% | |
| Tile groutper kgESTIMATED | $1.8 – $4 | 55% | |
| Acrylic paint (20 L drum)per drumESTIMATED | $35 – $80 | 56% | |
| General labourerper daySOURCED | $9.41 – $10.92 | 14% | |
| Masonper daySOURCED | $22.31 – $25.79 | 13% | |
| Carpenterper daySOURCED | $22.31 – $25.79 | 13% | |
| Steel fixerper daySOURCED | $22.31 – $25.79 | 13% | |
| Electricianper daySOURCED | $25.79 – $29.84 | 14% | |
| Plumberper daySOURCED | $25.79 – $29.84 | 14% | |
| Painterper daySOURCED | $14.5 – $19.39 | 25% | |
| Tilerper daySOURCED | $22.31 – $25.79 | 13% | |
| Site foremanper daySOURCED | $34.45 – $45.94 | 25% |
96 lines compared of 97 the pack carries · RWF · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $57.8 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.5 – $9.8 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7 – $25.2 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.3 – $4.2 | 69% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4.7 – $16 | 71% | |
| Exterior paint (20 L drum)per drumESTIMATED | $42 – $105 | 60% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $22 – $62 | 65% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $33 | 76% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $12 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $25 | 60% | |
| Grey cement (50 kg bag)per bagESTIMATED | $8.5 – $13 | 35% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.42 – $2 | 79% | |
| Slab proppingper m² of soffitDERIVED | $0.62 – $2.78 | 78% | |
| Setting outper metre of perimeterDERIVED | $0.21 – $1 | 79% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.31 – $1.67 | 81% | |
| Hand excavation, ordinary groundper m³DERIVED | $1 – $3.33 | 70% | |
| Washed crushed sand (0/5)per m³DERIVED | $30 – $57 | 47% | |
| Sandper m³ESTIMATED | $8 – $16 | 50% | |
| Crushed stoneper m³ESTIMATED | $12 – $24 | 50% | |
| Rubble stoneper m³ESTIMATED | $16 – $30 | 47% | |
| Reinforcement barper tonneESTIMATED | $890 – $1,740 | 49% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $920 – $1,500 | 39% | |
| Concrete block 150 mmeachDERIVED | $0.62 – $1 | 38% | |
| Concrete block 100 mmeachDERIVED | $0.42 – $0.68 | 38% | |
| Concrete block 200 mmeachDERIVED | $0.9 – $1.45 | 38% | |
| Half block 15 × 20 × 20eachDERIVED | $0.37 – $0.6 | 38% | |
| Half block 20 × 20 × 20eachDERIVED | $0.54 – $0.87 | 38% | |
| Hollow block 250 mmeachDERIVED | $1.05 – $1.68 | 37% | |
| Solid block 150 mmeachDERIVED | $1 – $1.6 | 38% | |
| Stabilised compressed earth blockeachESTIMATED | $0.24 – $0.58 | 59% | |
| Fired brickeachESTIMATED | $0.1 – $0.45 | 78% | |
| Mud brickeachESTIMATED | $0.04 – $0.11 | 64% | |
| Structural timber (eucalyptus, pine)per m³ESTIMATED | $130 – $260 | 50% | |
| Profiled galvanised sheetper sheetESTIMATED | $13 – $25 | 48% | |
| Roof tileeachESTIMATED | $0.75 – $1.8 | 58% | |
| Floor tilingper m²ESTIMATED | $8 – $30 | 73% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $32 – $78 | 59% | |
| Plasterboardper m²ESTIMATED | $7 – $18 | 61% | |
| Louvre windowper m²ESTIMATED | $26 – $62 | 58% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.24 | 67% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3.2 – $9.5 | 66% | |
| Generator, per kVAper kVAESTIMATED | $220 – $1,350 | 84% | |
| Solar PV, per Wpper WpESTIMATED | $0.85 – $1.6 | 47% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $95 – $200 | 53% | |
| Tile groutper kgESTIMATED | $1.6 – $3.6 | 56% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.55 – $1.3 | 58% | |
| Damp-proof course rollper linear metreESTIMATED | $1 – $2.4 | 58% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8.5 – $17 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.1 – $5.2 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.1 – $4.6 | 54% | |
| PVC ceiling panellingper m²ESTIMATED | $5.5 – $13 | 58% | |
| Skirtingper metreESTIMATED | $2.6 – $8 | 68% | |
| Metal door with frameper doorESTIMATED | $72 – $195 | 63% | |
| Timber door with frameper doorESTIMATED | $42 – $150 | 72% | |
| Glazed aluminium windowper m²ESTIMATED | $82 – $180 | 54% | |
| Burglar barper m²ESTIMATED | $24 – $64 | 63% | |
| Stair balustradeper metreESTIMATED | $38 – $140 | 73% | |
| Rainwater downpipeper metreESTIMATED | $4 – $12 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2 – $5.6 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.4 – $10 | 66% | |
| Plumbing point (WC + basin)per pointESTIMATED | $150 – $235 | 36% | |
| Sanitary wareper setESTIMATED | $100 – $340 | 71% | |
| Electrical pointper pointESTIMATED | $8 – $13.5 | 41% | |
| Distribution board, per wayper wayESTIMATED | $12 – $34 | 65% | |
| Earth electrodeper installationESTIMATED | $46 – $145 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5 – $13 | 62% | |
| Submersible pumpeachESTIMATED | $150 – $600 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $100 – $340 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.35 – $3.6 | 63% | |
| Instantaneous gas water heatereachESTIMATED | $100 – $300 | 67% | |
| Battery, per nominal kWhper kWhESTIMATED | $165 – $400 | 59% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $175 – $380 | 54% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9.5 – $17 | 44% | |
| Labourerper dayESTIMATED | $2.5 – $5 | 50% | |
| Masonper dayESTIMATED | $8 – $15 | 47% | |
| Carpenter / formworkerper dayESTIMATED | $8 – $15 | 47% | |
| Steelfixerper dayESTIMATED | $8 – $15 | 47% | |
| Electricianper dayESTIMATED | $10 – $19 | 47% | |
| Plumberper dayESTIMATED | $10 – $19 | 47% | |
| Painterper dayESTIMATED | $6 – $11 | 45% | |
| Tilerper dayESTIMATED | $8 – $15 | 47% | |
| Site foremanper dayESTIMATED | $15 – $28 | 46% |
96 lines compared of 97 the pack carries · NGN · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $13.5 – $47.6 | 72% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $2.8 – $8.2 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $5.2 – $20.2 | 74% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1 – $3.4 | 71% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $3.2 – $12 | 73% | |
| Exterior paint (20 L drum)per drumESTIMATED | $29 – $81 | 64% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $20 – $48 | 58% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $26 | 69% | |
| Electrical point, surface mountedper pointESTIMATED | $5 – $9 | 44% | |
| Ridge capping (pre-folded)per metreESTIMATED | $5 – $10 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $8 – $20 | 60% | |
| Grey cement (50 kg bag)per bagSOURCED | $8.47 – $11.05 | 23% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.4 – $1.8 | 78% | |
| Slab proppingper m² of soffitDERIVED | $0.6 – $2.5 | 76% | |
| Setting outper metre of perimeterDERIVED | $0.2 – $0.9 | 78% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.3 – $1.5 | 80% | |
| Hand excavation, ordinary groundper m³DERIVED | $0.96 – $3 | 68% | |
| Washed crushed sand (0/5)per m³DERIVED | $13.5 – $30 | 55% | |
| Sharp sandper m³ESTIMATED | $9 – $20 | 55% | |
| Crushed graniteper m³ESTIMATED | $16 – $34 | 53% | |
| Rubble stoneper m³ESTIMATED | $11 – $24 | 54% | |
| Reinforcement barper tonneESTIMATED | $560 – $950 | 41% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $720 – $1,200 | 40% | |
| Cement block, 9 inch (225 mm)eachDERIVED | $0.55 – $0.95 | 42% | |
| Cement block, 4 inch (100 mm)eachDERIVED | $0.32 – $0.55 | 42% | |
| Cement block, 8 inch (200 mm)eachDERIVED | $0.5 – $0.86 | 42% | |
| Half block 15 × 20 × 20eachDERIVED | $0.25 – $0.43 | 42% | |
| Half block 20 × 20 × 20eachDERIVED | $0.3 – $0.52 | 42% | |
| Hollow block, 10 inch (250 mm)eachDERIVED | $0.62 – $1.05 | 41% | |
| Solid block, 6 inch (150 mm)eachDERIVED | $0.68 – $1.15 | 41% | |
| Stabilised compressed earth blockeachESTIMATED | $0.15 – $0.4 | 63% | |
| Fired brickeachESTIMATED | $0.06 – $0.45 | 87% | |
| Mud brickeachESTIMATED | $0.03 – $0.09 | 67% | |
| Structural timberper m³ESTIMATED | $130 – $290 | 55% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $10 – $20 | 50% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $8 – $15 | 47% | |
| Roof tile (stone-coated)eachESTIMATED | $0.9 – $2.2 | 59% | |
| Floor tilingper m²ESTIMATED | $6 – $24 | 75% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $4 – $10 | 60% | |
| Tile groutper kgESTIMATED | $1.2 – $3 | 60% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $22 – $60 | 63% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.4 – $1 | 60% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.7 – $1.9 | 63% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $6.5 – $14 | 54% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $1.6 – $4.2 | 62% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $1.6 – $3.8 | 58% | |
| PVC ceiling panellingper m²ESTIMATED | $4 – $10 | 60% | |
| Plasterboard / POPper m²ESTIMATED | $5 – $15 | 67% | |
| Skirtingper metreESTIMATED | $1.8 – $6 | 70% | |
| Metal door with frameper doorESTIMATED | $55 – $160 | 66% | |
| Timber door with frameper doorESTIMATED | $30 – $120 | 75% | |
| Glazed aluminium windowper m²ESTIMATED | $60 – $150 | 60% | |
| Louvre windowper m²ESTIMATED | $22 – $55 | 60% | |
| Burglar barper m²ESTIMATED | $18 – $50 | 64% | |
| Stair balustradeper metreESTIMATED | $28 – $110 | 75% | |
| Gutterper metreESTIMATED | $4.5 – $13 | 65% | |
| Rainwater downpipeper metreESTIMATED | $3 – $10 | 70% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $1.5 – $4.5 | 67% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $2.5 – $8 | 69% | |
| Plumbing point (WC + basin)per pointESTIMATED | $110 – $190 | 42% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $75 – $290 | 74% | |
| Electrical point (socket or light)per pointESTIMATED | $6 – $11 | 45% | |
| Distribution board, per wayper wayESTIMATED | $9 – $28 | 68% | |
| Earth electrodeper installationESTIMATED | $35 – $120 | 71% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4 – $11 | 64% | |
| Storage tank, per litreper litreESTIMATED | $0.05 – $0.18 | 72% | |
| Submersible pumpeachESTIMATED | $110 – $480 | 77% | |
| Tank tower, per metre of heightper metreESTIMATED | $70 – $260 | 73% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1 – $2.8 | 64% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.4 – $7.5 | 68% | |
| Instantaneous gas water heatereachESTIMATED | $75 – $240 | 69% | |
| Generator, per kVAper kVAESTIMATED | $150 – $1,100 | 86% | |
| Solar PV, per Wpper WpESTIMATED | $0.7 – $1.3 | 46% | |
| Battery, per nominal kWhper kWhESTIMATED | $140 – $360 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $40 – $100 | 60% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $100 – $260 | 62% | |
| Labourerper daySOURCED | $2.4 – $4.5 | 47% | |
| Masonper dayESTIMATED | $6 – $12 | 50% | |
| Carpenter / formworkerper dayESTIMATED | $6 – $12 | 50% | |
| Steelfixerper dayESTIMATED | $6 – $12 | 50% | |
| Electricianper dayESTIMATED | $7.5 – $15 | 50% | |
| Plumberper dayESTIMATED | $7.5 – $15 | 50% | |
| Painterper dayESTIMATED | $4.5 – $9 | 50% | |
| Tilerper dayESTIMATED | $6 – $12 | 50% | |
| Site foremanper dayESTIMATED | $11 – $22 | 50% |
96 lines compared of 97 the pack carries · SLE · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4.6 – $13.8 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $7.5 – $22.5 | 67% | |
| Wall copingper metreESTIMATED | $7.5 – $20 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.5 – $4.38 | 66% | |
| Gate lock and drop boltper setESTIMATED | $75 – $250 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4.6 – $12.6 | 63% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.72 – $4.02 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2.3 – $8.05 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.38 – $4.02 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.69 – $1.84 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3.45 – $9.2 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18.8 – $63.8 | 71% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.88 – $11.3 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7.88 – $28.1 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.5 – $4.75 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4.14 – $16.1 | 74% | |
| Exterior paint (20 L drum)per drumESTIMATED | $40 – $110 | 64% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $25 – $65 | 62% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $10 – $36.3 | 72% | |
| Electrical point, surface mountedper pointESTIMATED | $6.9 – $11.5 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $7.5 – $12.5 | 40% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $11.3 – $26.3 | 57% | |
| Grey cement (50 kg bag)per bagDERIVED | $9 – $11 | 18% | |
| Scaffolding, erect and hireper m² of elevationESTIMATED | $0.32 – $1.84 | 83% | |
| Slab proppingper m² of soffitESTIMATED | $0.48 – $2.55 | 81% | |
| Setting outper metre of perimeterESTIMATED | $0.16 – $0.92 | 83% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.24 – $1.53 | 84% | |
| Hand excavation, ordinary groundper m³ESTIMATED | $0.78 – $3.07 | 75% | |
| Washed crushed sand (0/5)per m³ESTIMATED | $18.8 – $41.3 | 54% | |
| Sandper m³ESTIMATED | $6 – $16 | 63% | |
| Crushed graniteper m³ESTIMATED | $25 – $60 | 58% | |
| Rubble stoneper m³ESTIMATED | $16 – $34 | 53% | |
| Reinforcement barper tonneESTIMATED | $940 – $1,310 | 28% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $938 – $1,560 | 40% | |
| Cement block, 6 inch (150 mm)eachDERIVED | $0.6 – $1.1 | 45% | |
| Cement block, 4 inch (100 mm)eachESTIMATED | $0.38 – $0.69 | 45% | |
| Cement block, 8 inch (200 mm)eachESTIMATED | $0.73 – $1.25 | 42% | |
| Half block 15 × 20 × 20eachESTIMATED | $0.34 – $0.6 | 44% | |
| Half block 20 × 20 × 20eachESTIMATED | $0.44 – $0.75 | 42% | |
| Hollow block, 10 inch (250 mm)eachESTIMATED | $0.88 – $1.5 | 42% | |
| Solid block, 6 inch (150 mm)eachESTIMATED | $0.9 – $1.5 | 40% | |
| Stabilised compressed earth blockeachESTIMATED | $0.23 – $0.56 | 60% | |
| Fired brickeachESTIMATED | $0.09 – $0.63 | 86% | |
| Mud brickeachESTIMATED | $0.04 – $0.11 | 67% | |
| Structural timberper m³ESTIMATED | $190 – $390 | 51% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $14 – $26 | 46% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $10 – $18.8 | 47% | |
| Roof tile (stone-coated)eachESTIMATED | $1.1 – $2.8 | 61% | |
| Floor tilingper m²ESTIMATED | $7.5 – $31 | 76% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5.63 – $13.8 | 59% | |
| Tile groutper kgESTIMATED | $1.63 – $4 | 59% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $31 – $81 | 62% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.56 – $1.38 | 59% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $1 – $2.5 | 60% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8.75 – $18.8 | 53% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.25 – $5.63 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.25 – $5 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5.63 – $13.8 | 59% | |
| Plasterboard / POPper m²ESTIMATED | $7.5 – $20 | 63% | |
| Skirtingper metreESTIMATED | $2.5 – $8.75 | 71% | |
| Metal door with frameper doorESTIMATED | $75 – $219 | 66% | |
| Timber door with frameper doorESTIMATED | $40 – $163 | 75% | |
| Glazed aluminium windowper m²ESTIMATED | $81.3 – $200 | 59% | |
| Louvre windowper m²ESTIMATED | $30 – $72.5 | 59% | |
| Burglar barper m²ESTIMATED | $25 – $68.8 | 64% | |
| Stair balustradeper metreESTIMATED | $37.5 – $150 | 75% | |
| Gutterper metreESTIMATED | $6.5 – $18 | 64% | |
| Rainwater downpipeper metreESTIMATED | $4.38 – $13.8 | 68% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2.25 – $6.25 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.75 – $11.3 | 67% | |
| Plumbing point (WC + basin)per pointESTIMATED | $144 – $236 | 39% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $105 – $390 | 73% | |
| Electrical point (socket or light)per pointESTIMATED | $8.75 – $15 | 42% | |
| Distribution board, per wayper wayESTIMATED | $12.5 – $37.5 | 67% | |
| Earth electrodeper installationESTIMATED | $50 – $163 | 69% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $6 – $15 | 60% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.26 | 69% | |
| Submersible pumpeachESTIMATED | $163 – $650 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $97.7 – $334 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.38 – $3.75 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $106 – $338 | 69% | |
| Generator, per kVAper kVAESTIMATED | $220 – $1,400 | 84% | |
| Solar PV, per Wpper WpESTIMATED | $0.9 – $1.65 | 45% | |
| Battery, per nominal kWhper kWhESTIMATED | $188 – $475 | 60% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $60 – $145 | 59% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $138 – $350 | 61% | |
| Labourerper dayDERIVED | $2 – $4.5 | 56% | |
| Masonper dayESTIMATED | $4.5 – $9 | 50% | |
| Carpenter / formworkerper dayESTIMATED | $4.5 – $9 | 50% | |
| Steelfixerper dayESTIMATED | $4.5 – $9 | 50% | |
| Electricianper dayESTIMATED | $5.5 – $11 | 50% | |
| Plumberper dayESTIMATED | $5.5 – $11 | 50% | |
| Painterper dayESTIMATED | $3 – $6.5 | 54% | |
| Tilerper dayESTIMATED | $4.5 – $9 | 50% | |
| Site foremanper dayESTIMATED | $9 – $18 | 50% |
96 lines compared of 97 the pack carries · XAF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $19.5 – $62.9 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.8 – $10.5 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7.7 – $27 | 71% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.4 – $4.5 | 69% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $5.4 – $18 | 70% | |
| Exterior paint (20 L drum)per drumESTIMATED | $46 – $111 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $24 – $66 | 64% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $36 | 78% | |
| Electrical point, surface mountedper pointESTIMATED | $7 – $11 | 36% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $12 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $24 | 58% | |
| Grey cement (50 kg bag)per bagSOURCED | $8.17 – $10 | 18% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.89 – $3.4 | 74% | |
| Slab proppingper m² of soffitDERIVED | $1.34 – $4.72 | 72% | |
| Setting outper metre of perimeterDERIVED | $0.45 – $1.7 | 74% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.67 – $2.83 | 76% | |
| Hand excavation, ordinary groundper m³DERIVED | $2.14 – $5.67 | 62% | |
| Washed crushed sand (0/5)per m³DERIVED | $24 – $45 | 47% | |
| River sandper m³ESTIMATED | $16 – $30 | 47% | |
| Crushed gravelper m³ESTIMATED | $26 – $46 | 43% | |
| Rubble stoneper m³ESTIMATED | $18 – $32 | 44% | |
| Reinforcement barper tonneESTIMATED | $650 – $1,080 | 40% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $850 – $1,400 | 39% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.7 – $1.05 | 33% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.48 – $0.72 | 33% | |
| Cement block 20 × 20 × 40eachDERIVED | $1.05 – $1.55 | 32% | |
| Half block 15 × 20 × 20eachDERIVED | $0.42 – $0.63 | 33% | |
| Half block 20 × 20 × 20eachDERIVED | $0.63 – $0.93 | 32% | |
| Hollow block 25 × 20 × 40eachDERIVED | $1.18 – $1.75 | 33% | |
| Solid block 15 × 20 × 40eachDERIVED | $1.12 – $1.68 | 33% | |
| Stabilised compressed earth blockeachESTIMATED | $0.28 – $0.65 | 57% | |
| Fired brickeachESTIMATED | $0.09 – $0.55 | 84% | |
| Mud brickeachESTIMATED | $0.05 – $0.12 | 58% | |
| Structural timberper m³ESTIMATED | $170 – $350 | 51% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $13 – $24 | 46% | |
| Roof tileeachESTIMATED | $0.8 – $1.85 | 57% | |
| Floor tilingper m²ESTIMATED | $8 – $30 | 73% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $35 – $82 | 57% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $9 – $20 | 55% | |
| Louvre (naco) windowper m²ESTIMATED | $33 – $76 | 57% | |
| Gutterper metreESTIMATED | $6.5 – $17 | 62% | |
| Storage tank, per litreper litreESTIMATED | $0.09 – $0.28 | 68% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3.4 – $10 | 66% | |
| Generator, per kVAper kVAESTIMATED | $210 – $1,350 | 84% | |
| Solar PV, per Wpper WpESTIMATED | $0.9 – $1.7 | 47% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $75 – $160 | 53% | |
| Tile groutper kgESTIMATED | $1.7 – $3.8 | 55% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.6 – $1.4 | 57% | |
| Damp-proof course rollper linear metreESTIMATED | $1.1 – $2.6 | 58% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $9 – $18 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.3 – $5.6 | 59% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.3 – $4.9 | 53% | |
| PVC ceiling panellingper m²ESTIMATED | $6 – $14 | 57% | |
| Skirtingper metreESTIMATED | $3 – $9 | 67% | |
| Metal door with frameper doorESTIMATED | $80 – $210 | 62% | |
| Timber door with frameper doorESTIMATED | $45 – $165 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $90 – $195 | 54% | |
| Burglar barper m²ESTIMATED | $26 – $70 | 63% | |
| Stair balustradeper metreESTIMATED | $42 – $150 | 72% | |
| Rainwater downpipeper metreESTIMATED | $4.2 – $12.5 | 66% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2.2 – $6 | 63% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.8 – $10.5 | 64% | |
| Plumbing point (WC + basin)per pointESTIMATED | $170 – $255 | 33% | |
| Sanitary wareper setESTIMATED | $110 – $375 | 71% | |
| Electrical pointper pointESTIMATED | $9 – $14 | 36% | |
| Distribution board, per wayper wayESTIMATED | $13 – $37 | 65% | |
| Earth electrodeper installationESTIMATED | $50 – $155 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5.4 – $14 | 61% | |
| Submersible pumpeachESTIMATED | $165 – $650 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $110 – $370 | 70% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.45 – $3.9 | 63% | |
| Instantaneous gas water heatereachESTIMATED | $110 – $330 | 67% | |
| Battery, per nominal kWhper kWhESTIMATED | $175 – $430 | 59% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $150 – $340 | 56% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5.4 – $12.5 | 57% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $10 – $17.5 | 43% | |
| Labourerper daySOURCED | $5.35 – $8.5 | 37% | |
| Masonper dayESTIMATED | $11 – $20 | 45% | |
| Carpenter / formworkerper dayESTIMATED | $11 – $20 | 45% | |
| Steelfixerper dayESTIMATED | $11 – $20 | 45% | |
| Electricianper dayESTIMATED | $13 – $24 | 46% | |
| Plumberper dayESTIMATED | $13 – $24 | 46% | |
| Painterper dayESTIMATED | $8 – $14.5 | 45% | |
| Tilerper dayESTIMATED | $11 – $20 | 45% | |
| Site foremanper dayESTIMATED | $20 – $36 | 44% |
96 lines compared of 97 the pack carries · XOF · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $2.8 – $8.4 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $2.8 – $7.7 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.05 – $2.45 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $1.4 – $4.9 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $0.84 – $2.45 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.42 – $1.12 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $2.1 – $5.6 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $57.8 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.5 – $9.8 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7 – $24.8 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.3 – $4.1 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $3.15 – $11.2 | 72% | |
| Exterior paint (20 L drum)per drumESTIMATED | $39 – $94 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $21 – $56 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $31 | 74% | |
| Electrical point, surface mountedper pointESTIMATED | $4.2 – $7 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $11 | 45% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $22 | 55% | |
| Grey cement (50 kg bag)per bagDERIVED | $6.25 – $10 | 38% | |
| Scaffolding, erect and hireper m² of elevationESTIMATED | $0.67 – $2.38 | 72% | |
| Slab proppingper m² of soffitESTIMATED | $1 – $3.3 | 70% | |
| Setting outper metre of perimeterESTIMATED | $0.34 – $1.19 | 72% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.5 – $1.98 | 75% | |
| Hand excavation, ordinary groundper m³ESTIMATED | $1.6 – $3.97 | 60% | |
| Washed crushed sand (0/5)per m³ESTIMATED | $19.5 – $36 | 46% | |
| Lagoon or river sandper m³ESTIMATED | $9 – $15 | 40% | |
| Crushed gravelper m³ESTIMATED | $27 – $62 | 56% | |
| Rubble stoneper m³ESTIMATED | $20 – $44 | 55% | |
| Reinforcement barper tonneESTIMATED | $600 – $1,050 | 43% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $800 – $1,320 | 39% | |
| Cement block 15 × 20 × 40eachESTIMATED | $0.5 – $0.78 | 36% | |
| Cement block 10 × 20 × 40eachESTIMATED | $0.35 – $0.53 | 34% | |
| Cement block 20 × 20 × 40eachESTIMATED | $0.78 – $1.15 | 32% | |
| Half block 15 × 20 × 20eachESTIMATED | $0.3 – $0.47 | 36% | |
| Half block 20 × 20 × 20eachESTIMATED | $0.47 – $0.69 | 32% | |
| Hollow block 25 × 20 × 40eachESTIMATED | $0.88 – $1.3 | 32% | |
| Solid block 15 × 20 × 40eachESTIMATED | $0.82 – $1.25 | 34% | |
| Stabilised compressed earth blockeachESTIMATED | $0.18 – $0.45 | 60% | |
| Fired brickeachESTIMATED | $0.07 – $0.5 | 86% | |
| Mud brickeachESTIMATED | $0.03 – $0.08 | 63% | |
| Structural timberper m³ESTIMATED | $165 – $330 | 50% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $6 – $14 | 57% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9 – $16 | 44% | |
| Roof tileeachESTIMATED | $0.7 – $1.6 | 56% | |
| Floor tilingper m²ESTIMATED | $7 – $26 | 73% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Tile groutper kgESTIMATED | $1.5 – $3.5 | 57% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $31 – $72 | 57% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.5 – $1.2 | 58% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.9 – $2.3 | 61% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8 – $16 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2 – $5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2 – $4.4 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5 – $12 | 58% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $7 – $17 | 59% | |
| Skirtingper metreESTIMATED | $2.5 – $8 | 69% | |
| Metal door with frameper doorESTIMATED | $70 – $190 | 63% | |
| Timber door with frameper doorESTIMATED | $38 – $140 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $82 – $185 | 56% | |
| Louvre (naco) windowper m²ESTIMATED | $30 – $70 | 57% | |
| Burglar barper m²ESTIMATED | $24 – $65 | 63% | |
| Stair balustradeper metreESTIMATED | $38 – $140 | 73% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Rainwater downpipeper metreESTIMATED | $4 – $12 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2 – $5.5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.5 – $10 | 65% | |
| Plumbing point (WC + basin)per pointESTIMATED | $105 – $161 | 35% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $100 – $340 | 71% | |
| Electrical point (socket or light)per pointESTIMATED | $8 – $13 | 38% | |
| Distribution board, per wayper wayESTIMATED | $12 – $34 | 65% | |
| Earth electrodeper installationESTIMATED | $45 – $140 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5 – $13 | 62% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.26 | 69% | |
| Submersible pumpeachESTIMATED | $150 – $600 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $70 – $238 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.3 – $3.5 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $100 – $300 | 67% | |
| Generator, per kVAper kVAESTIMATED | $200 – $1,300 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.82 – $1.55 | 47% | |
| Battery, per nominal kWhper kWhESTIMATED | $160 – $400 | 60% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $55 – $120 | 54% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $130 – $300 | 57% | |
| Labourerper dayDERIVED | $4 – $6.7 | 40% | |
| Masonper dayESTIMATED | $8.3 – $15 | 45% | |
| Carpenter / formworkerper dayESTIMATED | $8.3 – $15 | 45% | |
| Steelfixerper dayESTIMATED | $8.3 – $15 | 45% | |
| Electricianper dayESTIMATED | $10 – $17.5 | 43% | |
| Plumberper dayESTIMATED | $10 – $17.5 | 43% | |
| Painterper dayESTIMATED | $5.8 – $11 | 47% | |
| Tilerper dayESTIMATED | $8.3 – $15 | 45% | |
| Site foremanper dayESTIMATED | $16.5 – $29 | 43% |
96 lines compared of 97 the pack carries · UGX · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $3.4 – $10.2 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $5.52 – $16.6 | 67% | |
| Wall copingper metreESTIMATED | $5.52 – $14.7 | 62% | |
| Damp-proof courseper metreESTIMATED | $1.1 – $3.22 | 66% | |
| Gate lock and drop boltper setESTIMATED | $55.2 – $184 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $3.4 – $9.35 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.27 – $2.98 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $1.7 – $5.95 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.02 – $2.98 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.51 – $1.36 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $2.55 – $6.8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $16.6 – $53.2 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.22 – $9.02 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $6.44 – $23.2 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.2 – $3.86 | 69% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4 – $13.6 | 71% | |
| Exterior paint (20 L drum)per drumESTIMATED | $38.6 – $96.6 | 60% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $20.2 – $57 | 65% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $7.36 – $30.4 | 76% | |
| Electrical point, surface mountedper pointESTIMATED | $5.1 – $8.5 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $5.52 – $11 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $9.2 – $23 | 60% | |
| Grey cement (50 kg bag)per bagESTIMATED | $7.8 – $9.1 | 14% | |
| Scaffolding, erect and hireper m² of elevationESTIMATED | $0.36 – $1.7 | 79% | |
| Slab proppingper m² of soffitESTIMATED | $0.53 – $2.36 | 78% | |
| Setting outper metre of perimeterESTIMATED | $0.18 – $0.85 | 79% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.26 – $1.42 | 81% | |
| Hand excavation, ordinary groundper m³ESTIMATED | $0.85 – $2.83 | 70% | |
| Washed crushed sand (0/5)per m³ESTIMATED | $27.6 – $52.4 | 47% | |
| Sandper m³ESTIMATED | $9 – $24 | 63% | |
| Crushed stoneper m³ESTIMATED | $20 – $32 | 38% | |
| Rubble stoneper m³ESTIMATED | $14 – $26 | 46% | |
| Reinforcement barper tonneESTIMATED | $900 – $1,310 | 31% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $846 – $1,380 | 39% | |
| Concrete block 150 mmeachESTIMATED | $0.46 – $0.62 | 26% | |
| Concrete block 100 mmeachESTIMATED | $0.39 – $0.63 | 38% | |
| Concrete block 200 mmeachESTIMATED | $0.83 – $1.33 | 38% | |
| Half block 15 × 20 × 20eachESTIMATED | $0.34 – $0.55 | 38% | |
| Half block 20 × 20 × 20eachESTIMATED | $0.5 – $0.8 | 38% | |
| Hollow block 250 mmeachESTIMATED | $0.97 – $1.55 | 38% | |
| Solid block 150 mmeachESTIMATED | $0.92 – $1.47 | 37% | |
| Stabilised compressed earth blockeachESTIMATED | $0.22 – $0.53 | 59% | |
| Fired brickeachESTIMATED | $0.09 – $0.4 | 78% | |
| Mud brickeachESTIMATED | $0.04 – $0.1 | 60% | |
| Structural timber (eucalyptus, pine)per m³ESTIMATED | $175 – $350 | 50% | |
| Profiled galvanised sheetper sheetESTIMATED | $8 – $13 | 38% | |
| Roof tileeachESTIMATED | $0.69 – $1.66 | 58% | |
| Floor tilingper m²ESTIMATED | $6 – $13 | 54% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $29.4 – $71.8 | 59% | |
| Plasterboardper m²ESTIMATED | $6.44 – $16.6 | 61% | |
| Louvre windowper m²ESTIMATED | $28 – $66 | 58% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.07 – $0.22 | 68% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.94 – $8.74 | 66% | |
| Generator, per kVAper kVAESTIMATED | $200 – $1,250 | 84% | |
| Solar PV, per Wpper WpESTIMATED | $0.78 – $1.45 | 46% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $70 – $150 | 53% | |
| Tile groutper kgESTIMATED | $1.47 – $3.31 | 56% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.51 – $1.2 | 58% | |
| Damp-proof course rollper linear metreESTIMATED | $0.92 – $2.21 | 58% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $7.82 – $15.6 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $1.93 – $4.78 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $1.93 – $4.23 | 54% | |
| PVC ceiling panellingper m²ESTIMATED | $5.06 – $12 | 58% | |
| Skirtingper metreESTIMATED | $2.39 – $7.36 | 68% | |
| Metal door with frameper doorESTIMATED | $66.2 – $179 | 63% | |
| Timber door with frameper doorESTIMATED | $38.6 – $138 | 72% | |
| Glazed aluminium windowper m²ESTIMATED | $75.4 – $166 | 55% | |
| Burglar barper m²ESTIMATED | $22.1 – $58.9 | 62% | |
| Stair balustradeper metreESTIMATED | $35 – $129 | 73% | |
| Rainwater downpipeper metreESTIMATED | $3.68 – $11 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $1.84 – $5.15 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.13 – $9.2 | 66% | |
| Plumbing point (WC + basin)per pointESTIMATED | $128 – $200 | 36% | |
| Sanitary wareper setESTIMATED | $92 – $313 | 71% | |
| Electrical pointper pointESTIMATED | $7.36 – $12.4 | 41% | |
| Distribution board, per wayper wayESTIMATED | $11 – $31.3 | 65% | |
| Earth electrodeper installationESTIMATED | $42.3 – $133 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4.6 – $12 | 62% | |
| Submersible pumpeachESTIMATED | $138 – $552 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $85 – $289 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.24 – $3.31 | 63% | |
| Instantaneous gas water heatereachESTIMATED | $92 – $276 | 67% | |
| Battery, per nominal kWhper kWhESTIMATED | $152 – $368 | 59% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $161 – $350 | 54% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $4.6 – $11 | 58% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $8.74 – $15.6 | 44% | |
| Labourerper dayESTIMATED | $2.5 – $5.5 | 55% | |
| Masonper dayESTIMATED | $5 – $10 | 50% | |
| Carpenter / formworkerper dayESTIMATED | $5 – $10 | 50% | |
| Steelfixerper dayESTIMATED | $5 – $10 | 50% | |
| Electricianper dayESTIMATED | $8 – $13.5 | 41% | |
| Plumberper dayESTIMATED | $8 – $13.5 | 41% | |
| Painterper dayESTIMATED | $3.5 – $7.5 | 53% | |
| Tilerper dayESTIMATED | $5 – $10 | 50% | |
| Site foremanper dayESTIMATED | $10 – $20 | 50% |
96 lines compared of 97 the pack carries · ZMW · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $9.6 – $28.8 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $7.08 – $21.2 | 67% | |
| Wall copingper metreESTIMATED | $7.08 – $18.9 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.42 – $4.13 | 66% | |
| Gate lock and drop boltper setESTIMATED | $70.8 – $236 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $9.6 – $26.4 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $3.6 – $8.4 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $4.8 – $16.8 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $2.88 – $8.4 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $1.44 – $3.84 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $7.2 – $19.2 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $17.7 – $60.2 | 71% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.42 – $10.1 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $6.61 – $24.4 | 73% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.18 – $4.01 | 71% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $7.68 – $28.8 | 73% | |
| Exterior paint (20 L drum)per drumESTIMATED | $36.6 – $99.1 | 63% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $23.6 – $59 | 60% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $9.44 – $33 | 71% | |
| Electrical point, surface mountedper pointESTIMATED | $12 – $21.6 | 44% | |
| Ridge capping (pre-folded)per metreESTIMATED | $5.9 – $11.8 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $9.44 – $23.6 | 60% | |
| Grey cement (50 kg bag)per bagESTIMATED | $6.5 – $9 | 28% | |
| Scaffolding, erect and hireper m² of elevationESTIMATED | $0.55 – $3.84 | 86% | |
| Slab proppingper m² of soffitESTIMATED | $0.84 – $5.33 | 84% | |
| Setting outper metre of perimeterESTIMATED | $0.29 – $1.92 | 85% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.41 – $3.19 | 87% | |
| Hand excavation, ordinary groundper m³ESTIMATED | $1.34 – $6.41 | 79% | |
| Washed crushed sand (0/5)per m³ESTIMATED | $19.5 – $42.5 | 54% | |
| Sandper m³ESTIMATED | $15 – $28 | 46% | |
| Crushed stoneper m³ESTIMATED | $15 – $30 | 50% | |
| Rubble stone (coral rag on Zanzibar)per m³ESTIMATED | $11 – $24 | 54% | |
| Reinforcement barper tonneESTIMATED | $700 – $1,030 | 32% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $897 – $1,480 | 39% | |
| Concrete block, 6 inch (150 mm)eachESTIMATED | $0.8 – $1.7 | 53% | |
| Concrete block, 4 inch (100 mm)eachESTIMATED | $0.33 – $0.59 | 44% | |
| Concrete block, 8 inch (200 mm)eachESTIMATED | $0.65 – $1.12 | 42% | |
| Half block 15 × 20 × 20eachESTIMATED | $0.3 – $0.53 | 44% | |
| Half block 20 × 20 × 20eachESTIMATED | $0.39 – $0.67 | 42% | |
| Hollow block, 10 inch (250 mm)eachESTIMATED | $0.78 – $1.36 | 43% | |
| Solid block, 6 inch (150 mm)eachESTIMATED | $0.8 – $1.36 | 41% | |
| Stabilised compressed earth blockeachESTIMATED | $0.18 – $0.47 | 63% | |
| Fired brickeachESTIMATED | $0.08 – $0.5 | 84% | |
| Mud brickeachESTIMATED | $0.02 – $0.09 | 75% | |
| Structural timberper m³ESTIMATED | $200 – $420 | 52% | |
| Profiled galvanised sheetper sheetESTIMATED | $8 – $14 | 43% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9.44 – $17.7 | 47% | |
| Roof tileeachESTIMATED | $0.83 – $2.12 | 61% | |
| Floor tilingper m²ESTIMATED | $5 – $12 | 58% | |
| Tile adhesive (20 kg bag)per bagESTIMATED | $4.72 – $11.8 | 60% | |
| Tile groutper kgESTIMATED | $1.42 – $3.54 | 60% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $28.3 – $73.2 | 61% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.53 – $1.3 | 59% | |
| Damp-proof course rollper linear metreESTIMATED | $0.94 – $2.36 | 60% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8.26 – $17.7 | 53% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.12 – $5.31 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.01 – $4.6 | 56% | |
| PVC ceiling panellingper m²ESTIMATED | $5.31 – $13 | 59% | |
| Plasterboardper m²ESTIMATED | $6.49 – $17.7 | 63% | |
| Skirtingper metreESTIMATED | $2.12 – $7.08 | 70% | |
| Metal door with frameper doorESTIMATED | $64.9 – $189 | 66% | |
| Timber door with frameper doorESTIMATED | $37.8 – $148 | 74% | |
| Glazed aluminium windowper m²ESTIMATED | $70 – $175 | 60% | |
| Louvre windowper m²ESTIMATED | $26 – $64.9 | 60% | |
| Burglar barper m²ESTIMATED | $21.2 – $59 | 64% | |
| Stair balustradeper metreESTIMATED | $33 – $130 | 75% | |
| Gutterper metreESTIMATED | $5.5 – $16 | 66% | |
| Rainwater downpipeper metreESTIMATED | $3.5 – $12 | 71% | |
| Supply pipeworkper metreESTIMATED | $1.89 – $5.43 | 65% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.07 – $9.44 | 67% | |
| Plumbing point (WC + basin)per pointESTIMATED | $264 – $456 | 42% | |
| Sanitary wareper setESTIMATED | $94.4 – $354 | 73% | |
| Electrical pointper pointESTIMATED | $7.08 – $13 | 46% | |
| Distribution board, per wayper wayESTIMATED | $11.8 – $35.4 | 67% | |
| Earth electrodeper installationESTIMATED | $44.8 – $148 | 70% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4.96 – $13.6 | 64% | |
| Storage tank, per litreper litreESTIMATED | $0.07 – $0.24 | 71% | |
| Submersible pumpeachESTIMATED | $142 – $590 | 76% | |
| Tank tower, per metre of heightper metreESTIMATED | $180 – $648 | 72% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.3 – $3.42 | 62% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.9 – $8.9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $95 – $310 | 69% | |
| Generator, per kVAper kVAESTIMATED | $200 – $1,300 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.8 – $1.5 | 47% | |
| Battery, per nominal kWhper kWhESTIMATED | $171 – $437 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $75 – $165 | 55% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $180 – $430 | 58% | |
| Labourerper dayDERIVED | $5.7 – $8 | 29% | |
| Masonper dayESTIMATED | $10 – $17 | 41% | |
| Carpenter / formworkerper dayESTIMATED | $10 – $17 | 41% | |
| Steelfixerper dayESTIMATED | $10 – $17 | 41% | |
| Electricianper dayESTIMATED | $12 – $20 | 40% | |
| Plumberper dayESTIMATED | $12 – $20 | 40% | |
| Painterper dayESTIMATED | $7.5 – $13 | 42% | |
| Tilerper dayESTIMATED | $10 – $17 | 41% | |
| Site foremanper dayESTIMATED | $20 – $34 | 41% |
96 lines compared of 97 the pack carries · XAF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $57.8 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.5 – $9.8 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7 – $24.8 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.3 – $4.1 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4.5 – $16 | 72% | |
| Exterior paint (20 L drum)per drumESTIMATED | $39 – $94 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $21 – $56 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $31 | 74% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $11 | 45% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $22 | 55% | |
| Grey cement (50 kg bag)per bagSOURCED | $7.17 – $8.83 | 19% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.77 – $2.8 | 73% | |
| Slab proppingper m² of soffitDERIVED | $1.15 – $3.89 | 70% | |
| Setting outper metre of perimeterDERIVED | $0.38 – $1.4 | 73% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.57 – $2.33 | 76% | |
| Hand excavation, ordinary groundper m³DERIVED | $1.84 – $4.67 | 61% | |
| Washed crushed sand (0/5)per m³DERIVED | $21 – $39 | 46% | |
| River sandper m³ESTIMATED | $14 – $26 | 46% | |
| Crushed gravelper m³ESTIMATED | $22 – $40 | 45% | |
| Rubble stoneper m³ESTIMATED | $16 – $28 | 43% | |
| Reinforcement barper tonneESTIMATED | $620 – $1,000 | 38% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $800 – $1,300 | 38% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.55 – $0.85 | 35% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.38 – $0.58 | 34% | |
| Cement block 20 × 20 × 40eachDERIVED | $0.85 – $1.25 | 32% | |
| Half block 15 × 20 × 20eachDERIVED | $0.33 – $0.51 | 35% | |
| Half block 20 × 20 × 20eachDERIVED | $0.51 – $0.75 | 32% | |
| Hollow block 25 × 20 × 40eachDERIVED | $0.95 – $1.4 | 32% | |
| Solid block 15 × 20 × 40eachDERIVED | $0.9 – $1.35 | 33% | |
| Stabilised compressed earth blockeachESTIMATED | $0.22 – $0.55 | 60% | |
| Fired brickeachESTIMATED | $0.07 – $0.5 | 86% | |
| Mud brickeachESTIMATED | $0.04 – $0.1 | 60% | |
| Structural timberper m³ESTIMATED | $160 – $330 | 52% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $12 – $22 | 45% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9 – $16 | 44% | |
| Roof tileeachESTIMATED | $0.7 – $1.6 | 56% | |
| Floor tilingper m²ESTIMATED | $7 – $26 | 73% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Tile groutper kgESTIMATED | $1.5 – $3.5 | 57% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $30 – $70 | 57% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.5 – $1.2 | 58% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.9 – $2.3 | 61% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8 – $16 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2 – $5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2 – $4.4 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5 – $12 | 58% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $7 – $17 | 59% | |
| Skirtingper metreESTIMATED | $2.5 – $8 | 69% | |
| Metal door with frameper doorESTIMATED | $70 – $190 | 63% | |
| Timber door with frameper doorESTIMATED | $38 – $140 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $80 – $180 | 56% | |
| Louvre (naco) windowper m²ESTIMATED | $30 – $70 | 57% | |
| Burglar barper m²ESTIMATED | $24 – $65 | 63% | |
| Stair balustradeper metreESTIMATED | $38 – $140 | 73% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Rainwater downpipeper metreESTIMATED | $4 – $12 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2 – $5.5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.5 – $10 | 65% | |
| Plumbing point (WC + basin)per pointESTIMATED | $150 – $230 | 35% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $100 – $340 | 71% | |
| Electrical point (socket or light)per pointESTIMATED | $8 – $13 | 38% | |
| Distribution board, per wayper wayESTIMATED | $12 – $34 | 65% | |
| Earth electrodeper installationESTIMATED | $45 – $140 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5 – $13 | 62% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.26 | 69% | |
| Submersible pumpeachESTIMATED | $150 – $600 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $100 – $340 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.3 – $3.5 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $100 – $300 | 67% | |
| Generator, per kVAper kVAESTIMATED | $200 – $1,300 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.8 – $1.5 | 47% | |
| Battery, per nominal kWhper kWhESTIMATED | $160 – $400 | 60% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $60 – $130 | 54% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $140 – $320 | 56% | |
| Labourerper daySOURCED | $4.6 – $7 | 34% | |
| Masonper dayESTIMATED | $9 – $16 | 44% | |
| Carpenter / formworkerper dayESTIMATED | $9 – $16 | 44% | |
| Steelfixerper dayESTIMATED | $9 – $16 | 44% | |
| Electricianper dayESTIMATED | $11 – $19 | 42% | |
| Plumberper dayESTIMATED | $11 – $19 | 42% | |
| Painterper dayESTIMATED | $6.5 – $12 | 46% | |
| Tilerper dayESTIMATED | $9 – $16 | 44% | |
| Site foremanper dayESTIMATED | $16 – $28 | 43% |
96 lines compared of 97 the pack carries · XAF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $21 – $64.6 | 67% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.9 – $11.2 | 65% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $8 – $27.9 | 71% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.5 – $4.7 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $5.4 – $18 | 70% | |
| Exterior paint (20 L drum)per drumESTIMATED | $49 – $119 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $27 – $70 | 61% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $9 – $40 | 78% | |
| Electrical point, surface mountedper pointESTIMATED | $7 – $12 | 42% | |
| Ridge capping (pre-folded)per metreESTIMATED | $7 – $13 | 46% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $11 – $26 | 58% | |
| Grey cement (50 kg bag, 42.5N)per bagDERIVED | $7.5 – $8.5 | 12% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $1.02 – $4.4 | 77% | |
| Slab proppingper m² of soffitDERIVED | $1.52 – $6.11 | 75% | |
| Setting outper metre of perimeterDERIVED | $0.51 – $2.2 | 77% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.76 – $3.67 | 79% | |
| Hand excavation, ordinary groundper m³DERIVED | $2.44 – $7.33 | 67% | |
| Washed crushed sand (0/5)per m³DERIVED | $27 – $51 | 47% | |
| Sandper m³ESTIMATED | $18 – $34 | 47% | |
| Crushed gravelper m³ESTIMATED | $28 – $50 | 44% | |
| Rubble stoneper m³ESTIMATED | $20 – $36 | 44% | |
| Reinforcement barper tonneESTIMATED | $680 – $1,120 | 39% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $880 – $1,450 | 39% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.65 – $0.98 | 34% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.45 – $0.68 | 34% | |
| Cement block 20 × 20 × 40eachDERIVED | $0.98 – $1.45 | 32% | |
| Half block 15 × 20 × 20eachDERIVED | $0.39 – $0.59 | 34% | |
| Half block 20 × 20 × 20eachDERIVED | $0.59 – $0.87 | 32% | |
| Hollow block 25 × 20 × 40eachDERIVED | $1.1 – $1.65 | 33% | |
| Solid block 15 × 20 × 40eachDERIVED | $1.05 – $1.58 | 34% | |
| Stabilised compressed earth blockeachESTIMATED | $0.28 – $0.65 | 57% | |
| Fired brickeachESTIMATED | $0.1 – $0.55 | 82% | |
| Mud brickeachESTIMATED | $0.05 – $0.13 | 62% | |
| Structural timber (okoumé, azobé)per m³ESTIMATED | $150 – $330 | 55% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $14 – $26 | 46% | |
| Roof tileeachESTIMATED | $0.85 – $1.9 | 55% | |
| Floor tilingper m²ESTIMATED | $9 – $32 | 72% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $38 – $88 | 57% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $9 – $21 | 57% | |
| Louvre (naco) windowper m²ESTIMATED | $34 – $78 | 56% | |
| Gutterper metreESTIMATED | $7 – $18 | 61% | |
| Storage tank, per litreper litreESTIMATED | $0.1 – $0.3 | 67% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3.8 – $11 | 65% | |
| Generator, per kVAper kVAESTIMATED | $240 – $1,450 | 83% | |
| Solar PV, per Wpper WpESTIMATED | $0.95 – $1.8 | 47% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $80 – $170 | 53% | |
| Tile groutper kgESTIMATED | $1.7 – $3.8 | 55% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.6 – $1.4 | 57% | |
| Damp-proof course rollper linear metreESTIMATED | $1.1 – $2.6 | 58% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $9 – $18 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.3 – $5.6 | 59% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.3 – $4.9 | 53% | |
| PVC ceiling panellingper m²ESTIMATED | $6 – $14 | 57% | |
| Skirtingper metreESTIMATED | $3 – $9 | 67% | |
| Metal door with frameper doorESTIMATED | $85 – $220 | 61% | |
| Timber door with frameper doorESTIMATED | $50 – $180 | 72% | |
| Glazed aluminium windowper m²ESTIMATED | $95 – $205 | 54% | |
| Burglar barper m²ESTIMATED | $28 – $74 | 62% | |
| Stair balustradeper metreESTIMATED | $45 – $160 | 72% | |
| Rainwater downpipeper metreESTIMATED | $4.5 – $13 | 65% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2.3 – $6.2 | 63% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $4 – $11 | 64% | |
| Plumbing point (WC + basin)per pointESTIMATED | $175 – $265 | 34% | |
| Sanitary wareper setESTIMATED | $115 – $390 | 71% | |
| Electrical pointper pointESTIMATED | $9 – $15 | 40% | |
| Distribution board, per wayper wayESTIMATED | $14 – $38 | 63% | |
| Earth electrodeper installationESTIMATED | $52 – $160 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5.6 – $15 | 63% | |
| Submersible pumpeachESTIMATED | $175 – $680 | 74% | |
| Tank tower, per metre of heightper metreESTIMATED | $115 – $385 | 70% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.5 – $4 | 63% | |
| Instantaneous gas water heatereachESTIMATED | $115 – $340 | 66% | |
| Battery, per nominal kWhper kWhESTIMATED | $180 – $450 | 60% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $160 – $360 | 56% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5.6 – $13 | 57% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $10 – $18 | 44% | |
| Labourerper daySOURCED | $6.1 – $11 | 45% | |
| Masonper dayESTIMATED | $14 – $26 | 46% | |
| Carpenter / formworkerper dayESTIMATED | $14 – $26 | 46% | |
| Steelfixerper dayESTIMATED | $14 – $26 | 46% | |
| Electricianper dayESTIMATED | $17 – $32 | 47% | |
| Plumberper dayESTIMATED | $17 – $32 | 47% | |
| Painterper dayESTIMATED | $10 – $19 | 47% | |
| Tilerper dayESTIMATED | $14 – $26 | 46% | |
| Site foremanper dayESTIMATED | $26 – $48 | 46% |
96 lines compared of 97 the pack carries · GHS · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $15 – $51 | 71% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.1 – $9 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $6.3 – $22.5 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.2 – $3.8 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $3.6 – $14 | 74% | |
| Exterior paint (20 L drum)per drumESTIMATED | $32 – $88 | 64% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $20 – $52 | 62% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $29 | 72% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $10 | 40% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $9 – $21 | 57% | |
| Grey cement (50 kg bag)per bagSOURCED | $4.26 – $8.09 | 47% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.28 – $1.6 | 83% | |
| Slab proppingper m² of soffitDERIVED | $0.42 – $2.22 | 81% | |
| Setting outper metre of perimeterDERIVED | $0.14 – $0.8 | 83% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.21 – $1.33 | 84% | |
| Hand excavation, ordinary groundper m³DERIVED | $0.68 – $2.67 | 75% | |
| Washed crushed sand (0/5)per m³DERIVED | $15 – $33 | 55% | |
| Sandper m³ESTIMATED | $10 – $22 | 55% | |
| Crushed graniteper m³ESTIMATED | $17 – $35 | 51% | |
| Rubble stoneper m³ESTIMATED | $12 – $25 | 52% | |
| Reinforcement barper tonneESTIMATED | $580 – $980 | 41% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $750 – $1,250 | 40% | |
| Cement block, 6 inch (150 mm)eachDERIVED | $0.45 – $0.8 | 44% | |
| Cement block, 4 inch (100 mm)eachDERIVED | $0.3 – $0.55 | 45% | |
| Cement block, 8 inch (200 mm)eachDERIVED | $0.58 – $1 | 42% | |
| Half block 15 × 20 × 20eachDERIVED | $0.27 – $0.48 | 44% | |
| Half block 20 × 20 × 20eachDERIVED | $0.35 – $0.6 | 42% | |
| Hollow block, 10 inch (250 mm)eachDERIVED | $0.7 – $1.2 | 42% | |
| Solid block, 6 inch (150 mm)eachDERIVED | $0.72 – $1.2 | 40% | |
| Stabilised compressed earth blockeachESTIMATED | $0.18 – $0.45 | 60% | |
| Fired brickeachESTIMATED | $0.07 – $0.5 | 86% | |
| Mud brickeachESTIMATED | $0.03 – $0.09 | 67% | |
| Structural timberper m³ESTIMATED | $150 – $310 | 52% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $11 – $21 | 48% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $8 – $15 | 47% | |
| Roof tile (stone-coated)eachESTIMATED | $0.9 – $2.2 | 59% | |
| Floor tilingper m²ESTIMATED | $6 – $25 | 76% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $4.5 – $11 | 59% | |
| Tile groutper kgESTIMATED | $1.3 – $3.2 | 59% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $25 – $65 | 62% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.45 – $1.1 | 59% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.8 – $2 | 60% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $7 – $15 | 53% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $1.8 – $4.5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $1.8 – $4 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $4.5 – $11 | 59% | |
| Plasterboard / POPper m²ESTIMATED | $6 – $16 | 63% | |
| Skirtingper metreESTIMATED | $2 – $7 | 71% | |
| Metal door with frameper doorESTIMATED | $60 – $175 | 66% | |
| Timber door with frameper doorESTIMATED | $32 – $130 | 75% | |
| Glazed aluminium windowper m²ESTIMATED | $65 – $160 | 59% | |
| Louvre windowper m²ESTIMATED | $24 – $58 | 59% | |
| Burglar barper m²ESTIMATED | $20 – $55 | 64% | |
| Stair balustradeper metreESTIMATED | $30 – $120 | 75% | |
| Gutterper metreESTIMATED | $5 – $14 | 64% | |
| Rainwater downpipeper metreESTIMATED | $3.5 – $11 | 68% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $1.8 – $5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3 – $9 | 67% | |
| Plumbing point (WC + basin)per pointESTIMATED | $125 – $205 | 39% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $85 – $310 | 73% | |
| Electrical point (socket or light)per pointESTIMATED | $7 – $12 | 42% | |
| Distribution board, per wayper wayESTIMATED | $10 – $30 | 67% | |
| Earth electrodeper installationESTIMATED | $40 – $130 | 69% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4.5 – $12 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.06 – $0.2 | 70% | |
| Submersible pumpeachESTIMATED | $130 – $520 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $85 – $290 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.1 – $3 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.6 – $8 | 68% | |
| Instantaneous gas water heatereachESTIMATED | $85 – $270 | 69% | |
| Generator, per kVAper kVAESTIMATED | $170 – $1,150 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.75 – $1.4 | 46% | |
| Battery, per nominal kWhper kWhESTIMATED | $150 – $380 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $45 – $110 | 59% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $110 – $280 | 61% | |
| Labourerper daySOURCED | $1.7 – $4 | 57% | |
| Masonper dayESTIMATED | $6 – $13 | 54% | |
| Carpenter / formworkerper dayESTIMATED | $6 – $13 | 54% | |
| Steelfixerper dayESTIMATED | $6 – $13 | 54% | |
| Electricianper dayESTIMATED | $8 – $16 | 50% | |
| Plumberper dayESTIMATED | $8 – $16 | 50% | |
| Painterper dayESTIMATED | $4.5 – $10 | 55% | |
| Tilerper dayESTIMATED | $6 – $13 | 54% | |
| Site foremanper dayESTIMATED | $12 – $24 | 50% |
96 lines compared of 97 the pack carries · XOF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $57.8 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.5 – $9.8 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7 – $24.8 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.3 – $4.1 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4.5 – $16 | 72% | |
| Exterior paint (20 L drum)per drumESTIMATED | $39 – $94 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $21 – $56 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $31 | 74% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $11 | 45% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $22 | 55% | |
| Grey cement (50 kg bag)per bagSOURCED | $6.5 – $8 | 19% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.95 – $3.4 | 72% | |
| Slab proppingper m² of soffitDERIVED | $1.43 – $4.72 | 70% | |
| Setting outper metre of perimeterDERIVED | $0.48 – $1.7 | 72% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.71 – $2.83 | 75% | |
| Hand excavation, ordinary groundper m³DERIVED | $2.28 – $5.67 | 60% | |
| Washed crushed sand (0/5)per m³DERIVED | $19.5 – $36 | 46% | |
| Lagoon or river sandper m³ESTIMATED | $13 – $24 | 46% | |
| Crushed gravelper m³ESTIMATED | $21 – $38 | 45% | |
| Rubble stoneper m³ESTIMATED | $15 – $27 | 44% | |
| Reinforcement barper tonneESTIMATED | $600 – $980 | 39% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $780 – $1,280 | 39% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.5 – $0.78 | 36% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.35 – $0.53 | 34% | |
| Cement block 20 × 20 × 40eachDERIVED | $0.78 – $1.15 | 32% | |
| Half block 15 × 20 × 20eachDERIVED | $0.3 – $0.47 | 36% | |
| Half block 20 × 20 × 20eachDERIVED | $0.47 – $0.69 | 32% | |
| Hollow block 25 × 20 × 40eachDERIVED | $0.88 – $1.3 | 32% | |
| Solid block 15 × 20 × 40eachDERIVED | $0.82 – $1.25 | 34% | |
| Stabilised compressed earth blockeachESTIMATED | $0.2 – $0.5 | 60% | |
| Fired brickeachESTIMATED | $0.07 – $0.5 | 86% | |
| Mud brickeachESTIMATED | $0.04 – $0.1 | 60% | |
| Structural timberper m³ESTIMATED | $170 – $340 | 50% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $12 – $22 | 45% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9 – $16 | 44% | |
| Roof tileeachESTIMATED | $0.7 – $1.6 | 56% | |
| Floor tilingper m²ESTIMATED | $7 – $26 | 73% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Tile groutper kgESTIMATED | $1.5 – $3.5 | 57% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $30 – $70 | 57% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.5 – $1.2 | 58% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.9 – $2.3 | 61% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8 – $16 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2 – $5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2 – $4.4 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5 – $12 | 58% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $7 – $17 | 59% | |
| Skirtingper metreESTIMATED | $2.5 – $8 | 69% | |
| Metal door with frameper doorESTIMATED | $70 – $190 | 63% | |
| Timber door with frameper doorESTIMATED | $38 – $140 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $80 – $180 | 56% | |
| Louvre (naco) windowper m²ESTIMATED | $30 – $70 | 57% | |
| Burglar barper m²ESTIMATED | $24 – $65 | 63% | |
| Stair balustradeper metreESTIMATED | $38 – $140 | 73% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Rainwater downpipeper metreESTIMATED | $4 – $12 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2 – $5.5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.5 – $10 | 65% | |
| Plumbing point (WC + basin)per pointESTIMATED | $150 – $230 | 35% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $100 – $340 | 71% | |
| Electrical point (socket or light)per pointESTIMATED | $8 – $13 | 38% | |
| Distribution board, per wayper wayESTIMATED | $12 – $34 | 65% | |
| Earth electrodeper installationESTIMATED | $45 – $140 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5 – $13 | 62% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.26 | 69% | |
| Submersible pumpeachESTIMATED | $150 – $600 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $100 – $340 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.3 – $3.5 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $100 – $300 | 67% | |
| Generator, per kVAper kVAESTIMATED | $190 – $1,250 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.8 – $1.5 | 47% | |
| Battery, per nominal kWhper kWhESTIMATED | $160 – $400 | 60% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $60 – $130 | 54% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $140 – $320 | 56% | |
| Labourerper daySOURCED | $5.7 – $8.5 | 33% | |
| Masonper dayESTIMATED | $11 – $19 | 42% | |
| Carpenter / formworkerper dayESTIMATED | $11 – $19 | 42% | |
| Steelfixerper dayESTIMATED | $11 – $19 | 42% | |
| Electricianper dayESTIMATED | $13 – $23 | 43% | |
| Plumberper dayESTIMATED | $13 – $23 | 43% | |
| Painterper dayESTIMATED | $8 – $14 | 43% | |
| Tilerper dayESTIMATED | $11 – $19 | 42% | |
| Site foremanper dayESTIMATED | $20 – $34 | 41% |
96 lines compared of 97 the pack carries · TZS · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $15 – $51 | 71% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $2.9 – $8.6 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $5.6 – $20.7 | 73% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1 – $3.4 | 71% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $3.2 – $12 | 73% | |
| Exterior paint (20 L drum)per drumESTIMATED | $31 – $84 | 63% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $20 – $50 | 60% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $28 | 71% | |
| Electrical point, surface mountedper pointESTIMATED | $5 – $9 | 44% | |
| Ridge capping (pre-folded)per metreESTIMATED | $5 – $10 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $8 – $20 | 60% | |
| Grey cement (50 kg bag)per bagSOURCED | $5.67 – $6.86 | 17% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.23 – $1.6 | 86% | |
| Slab proppingper m² of soffitDERIVED | $0.35 – $2.22 | 84% | |
| Setting outper metre of perimeterDERIVED | $0.12 – $0.8 | 85% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.17 – $1.33 | 87% | |
| Hand excavation, ordinary groundper m³DERIVED | $0.56 – $2.67 | 79% | |
| Washed crushed sand (0/5)per m³DERIVED | $16.5 – $36 | 54% | |
| Sandper m³ESTIMATED | $11 – $24 | 54% | |
| Crushed stoneper m³ESTIMATED | $17 – $34 | 50% | |
| Rubble stone (coral rag on Zanzibar)per m³ESTIMATED | $12 – $26 | 54% | |
| Reinforcement barper tonneESTIMATED | $590 – $990 | 40% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $760 – $1,250 | 39% | |
| Concrete block, 6 inch (150 mm)eachDERIVED | $0.42 – $0.75 | 44% | |
| Concrete block, 4 inch (100 mm)eachDERIVED | $0.28 – $0.5 | 44% | |
| Concrete block, 8 inch (200 mm)eachDERIVED | $0.55 – $0.95 | 42% | |
| Half block 15 × 20 × 20eachDERIVED | $0.25 – $0.45 | 44% | |
| Half block 20 × 20 × 20eachDERIVED | $0.33 – $0.57 | 42% | |
| Hollow block, 10 inch (250 mm)eachDERIVED | $0.66 – $1.15 | 43% | |
| Solid block, 6 inch (150 mm)eachDERIVED | $0.68 – $1.15 | 41% | |
| Stabilised compressed earth blockeachESTIMATED | $0.15 – $0.4 | 63% | |
| Fired brickeachESTIMATED | $0.05 – $0.4 | 88% | |
| Mud brickeachESTIMATED | $0.02 – $0.08 | 75% | |
| Structural timberper m³ESTIMATED | $140 – $300 | 53% | |
| Profiled galvanised sheetper sheetESTIMATED | $10 – $20 | 50% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $8 – $15 | 47% | |
| Roof tileeachESTIMATED | $0.7 – $1.8 | 61% | |
| Floor tilingper m²ESTIMATED | $6 – $24 | 75% | |
| Tile adhesive (20 kg bag)per bagESTIMATED | $4 – $10 | 60% | |
| Tile groutper kgESTIMATED | $1.2 – $3 | 60% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $24 – $62 | 61% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.45 – $1.1 | 59% | |
| Damp-proof course rollper linear metreESTIMATED | $0.8 – $2 | 60% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $7 – $15 | 53% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $1.8 – $4.5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $1.7 – $3.9 | 56% | |
| PVC ceiling panellingper m²ESTIMATED | $4.5 – $11 | 59% | |
| Plasterboardper m²ESTIMATED | $5.5 – $15 | 63% | |
| Skirtingper metreESTIMATED | $1.8 – $6 | 70% | |
| Metal door with frameper doorESTIMATED | $55 – $160 | 66% | |
| Timber door with frameper doorESTIMATED | $32 – $125 | 74% | |
| Glazed aluminium windowper m²ESTIMATED | $60 – $150 | 60% | |
| Louvre windowper m²ESTIMATED | $22 – $55 | 60% | |
| Burglar barper m²ESTIMATED | $18 – $50 | 64% | |
| Stair balustradeper metreESTIMATED | $28 – $110 | 75% | |
| Gutterper metreESTIMATED | $4.5 – $13 | 65% | |
| Rainwater downpipeper metreESTIMATED | $3 – $10 | 70% | |
| Supply pipeworkper metreESTIMATED | $1.6 – $4.6 | 65% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $2.6 – $8 | 68% | |
| Plumbing point (WC + basin)per pointESTIMATED | $110 – $190 | 42% | |
| Sanitary wareper setESTIMATED | $80 – $300 | 73% | |
| Electrical pointper pointESTIMATED | $6 – $11 | 45% | |
| Distribution board, per wayper wayESTIMATED | $10 – $30 | 67% | |
| Earth electrodeper installationESTIMATED | $38 – $125 | 70% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4.2 – $11.5 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.06 – $0.19 | 71% | |
| Submersible pumpeachESTIMATED | $120 – $500 | 76% | |
| Tank tower, per metre of heightper metreESTIMATED | $75 – $270 | 72% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.1 – $2.9 | 62% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.5 – $7.5 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $80 – $260 | 69% | |
| Generator, per kVAper kVAESTIMATED | $180 – $1,200 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.72 – $1.35 | 47% | |
| Battery, per nominal kWhper kWhESTIMATED | $145 – $370 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $50 – $115 | 57% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $120 – $290 | 59% | |
| Labourerper daySOURCED | $1.4 – $4 | 65% | |
| Masonper dayESTIMATED | $6 – $12 | 50% | |
| Carpenter / formworkerper dayESTIMATED | $6 – $12 | 50% | |
| Steelfixerper dayESTIMATED | $6 – $12 | 50% | |
| Electricianper dayESTIMATED | $7.5 – $15 | 50% | |
| Plumberper dayESTIMATED | $7.5 – $15 | 50% | |
| Painterper dayESTIMATED | $4.5 – $9 | 50% | |
| Tilerper dayESTIMATED | $6 – $12 | 50% | |
| Site foremanper dayESTIMATED | $11 – $22 | 50% |
96 lines compared of 97 the pack carries · MZN · August 30, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $9.8 – $29.4 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $7.2 – $21.6 | 67% | |
| Wall copingper metreESTIMATED | $7.2 – $19.2 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.44 – $4.2 | 66% | |
| Gate lock and drop boltper setESTIMATED | $72 – $240 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $9.8 – $27 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $3.68 – $8.58 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $4.9 – $17.2 | 72% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $2.94 – $8.58 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $1.47 – $3.92 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $7.35 – $19.6 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $61.2 | 71% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.48 – $10.3 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $6.72 – $24.8 | 73% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.2 – $4.08 | 71% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $7.84 – $29.4 | 73% | |
| Exterior paint (20 L drum)per drumESTIMATED | $37.2 – $101 | 63% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $24 – $60 | 60% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $9.6 – $33.6 | 71% | |
| Electrical point, surface mountedper pointESTIMATED | $12.3 – $22.1 | 44% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $12 | 50% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $9.6 – $24 | 60% | |
| Grey cement (50 kg bag)per bagESTIMATED | $5 – $6.7 | 25% | |
| Scaffolding, erect and hireper m² of elevationESTIMATED | $0.56 – $3.92 | 86% | |
| Slab proppingper m² of soffitESTIMATED | $0.86 – $5.44 | 84% | |
| Setting outper metre of perimeterESTIMATED | $0.29 – $1.96 | 85% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.42 – $3.26 | 87% | |
| Hand excavation, ordinary groundper m³ESTIMATED | $1.37 – $6.54 | 79% | |
| Washed crushed sand (0/5)per m³ESTIMATED | $19.8 – $43.2 | 54% | |
| Sandper m³ESTIMATED | $13 – $29 | 55% | |
| Crushed stoneper m³ESTIMATED | $20 – $41 | 51% | |
| Rubble stone (coral rag on Zanzibar)per m³ESTIMATED | $14 – $31 | 55% | |
| Reinforcement barper tonneESTIMATED | $845 – $1,410 | 40% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $912 – $1,500 | 39% | |
| Concrete block, 6 inch (150 mm)eachESTIMATED | $0.39 – $0.52 | 25% | |
| Concrete block, 4 inch (100 mm)eachESTIMATED | $0.34 – $0.6 | 44% | |
| Concrete block, 8 inch (200 mm)eachESTIMATED | $0.66 – $1.14 | 42% | |
| Half block 15 × 20 × 20eachESTIMATED | $0.3 – $0.54 | 44% | |
| Half block 20 × 20 × 20eachESTIMATED | $0.4 – $0.68 | 42% | |
| Hollow block, 10 inch (250 mm)eachESTIMATED | $0.79 – $1.38 | 43% | |
| Solid block, 6 inch (150 mm)eachESTIMATED | $0.82 – $1.38 | 41% | |
| Stabilised compressed earth blockeachESTIMATED | $0.18 – $0.48 | 63% | |
| Fired brickeachESTIMATED | $0.06 – $0.45 | 87% | |
| Mud brickeachESTIMATED | $0.02 – $0.1 | 75% | |
| Structural timberper m³ESTIMATED | $350 – $700 | 50% | |
| Profiled galvanised sheetper sheetESTIMATED | $8 – $19 | 58% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9.6 – $18 | 47% | |
| Roof tileeachESTIMATED | $0.84 – $2.16 | 61% | |
| Floor tilingper m²ESTIMATED | $7.2 – $29 | 75% | |
| Tile adhesive (20 kg bag)per bagESTIMATED | $4.8 – $12 | 60% | |
| Tile groutper kgESTIMATED | $1.44 – $3.6 | 60% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $28.8 – $74.4 | 61% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.54 – $1.32 | 59% | |
| Damp-proof course rollper linear metreESTIMATED | $0.96 – $2.4 | 60% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8.4 – $18 | 53% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2.16 – $5.4 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.04 – $4.68 | 56% | |
| PVC ceiling panellingper m²ESTIMATED | $5.4 – $13.2 | 59% | |
| Plasterboardper m²ESTIMATED | $6.6 – $18 | 63% | |
| Skirtingper metreESTIMATED | $2.16 – $7.2 | 70% | |
| Metal door with frameper doorESTIMATED | $66 – $192 | 66% | |
| Timber door with frameper doorESTIMATED | $38.4 – $150 | 74% | |
| Glazed aluminium windowper m²ESTIMATED | $72 – $180 | 60% | |
| Louvre windowper m²ESTIMATED | $30 – $72 | 58% | |
| Burglar barper m²ESTIMATED | $21.6 – $60 | 64% | |
| Stair balustradeper metreESTIMATED | $33.6 – $132 | 75% | |
| Gutterper metreESTIMATED | $5.4 – $16 | 66% | |
| Rainwater downpipeper metreESTIMATED | $3.6 – $12 | 70% | |
| Supply pipeworkper metreESTIMATED | $1.92 – $5.52 | 65% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.12 – $9.6 | 68% | |
| Plumbing point (WC + basin)per pointESTIMATED | $270 – $466 | 42% | |
| Sanitary wareper setESTIMATED | $96 – $360 | 73% | |
| Electrical pointper pointESTIMATED | $7.2 – $13.2 | 45% | |
| Distribution board, per wayper wayESTIMATED | $12 – $36 | 67% | |
| Earth electrodeper installationESTIMATED | $45.6 – $150 | 70% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5.04 – $13.8 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.07 – $0.23 | 71% | |
| Submersible pumpeachESTIMATED | $144 – $600 | 76% | |
| Tank tower, per metre of heightper metreESTIMATED | $184 – $662 | 72% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.32 – $3.48 | 62% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $96 – $312 | 69% | |
| Generator, per kVAper kVAESTIMATED | $215 – $1,440 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.86 – $1.6 | 46% | |
| Battery, per nominal kWhper kWhESTIMATED | $174 – $444 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $60 – $140 | 57% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $144 – $348 | 59% | |
| Labourerper dayDERIVED | $5.24 – $8 | 35% | |
| Masonper dayESTIMATED | $8 – $15 | 47% | |
| Carpenter / formworkerper dayESTIMATED | $8 – $15 | 47% | |
| Steelfixerper dayESTIMATED | $8 – $15 | 47% | |
| Electricianper dayESTIMATED | $10 – $18 | 44% | |
| Plumberper dayESTIMATED | $10 – $18 | 44% | |
| Painterper dayESTIMATED | $6.5 – $11.5 | 43% | |
| Tilerper dayESTIMATED | $8 – $15 | 47% | |
| Site foremanper dayESTIMATED | $16 – $30 | 47% |
96 lines compared of 97 the pack carries · KES · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $16.5 – $54.4 | 70% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.1 – $9 | 66% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $6.3 – $22.5 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.2 – $3.8 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4 – $14 | 71% | |
| Exterior paint (20 L drum)per drumESTIMATED | $36 – $94 | 62% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $20 – $56 | 64% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $33 | 76% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $11 | 45% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $9 – $22 | 59% | |
| Grey cement (50 kg bag)per bagSOURCED | $5.02 – $6.61 | 24% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.95 – $3.6 | 74% | |
| Slab proppingper m² of soffitDERIVED | $1.43 – $5 | 71% | |
| Setting outper metre of perimeterDERIVED | $0.48 – $1.8 | 73% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.71 – $3 | 76% | |
| Hand excavation, ordinary groundper m³DERIVED | $2.28 – $6 | 62% | |
| Washed crushed sand (0/5)per m³DERIVED | $24 – $51 | 53% | |
| River sandper m³ESTIMATED | $16 – $34 | 53% | |
| Crushed stoneper m³ESTIMATED | $22 – $42 | 48% | |
| Machine-cut building stoneper m³ESTIMATED | $26 – $48 | 46% | |
| Reinforcement barper tonneESTIMATED | $620 – $1,020 | 39% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $800 – $1,300 | 38% | |
| Concrete block, 9 inch (225 mm)eachDERIVED | $0.6 – $1 | 40% | |
| Concrete block, 4 inch (100 mm)eachDERIVED | $0.35 – $0.58 | 40% | |
| Concrete block, 8 inch (200 mm)eachDERIVED | $0.55 – $0.92 | 40% | |
| Half block 15 × 20 × 20eachDERIVED | $0.27 – $0.45 | 40% | |
| Half block 20 × 20 × 20eachDERIVED | $0.33 – $0.55 | 40% | |
| Hollow block, 10 inch (250 mm)eachDERIVED | $0.68 – $1.15 | 41% | |
| Solid block, 6 inch (150 mm)eachDERIVED | $0.72 – $1.2 | 40% | |
| Stabilised compressed earth blockeachESTIMATED | $0.2 – $0.5 | 60% | |
| Fired brickeachESTIMATED | $0.08 – $0.5 | 84% | |
| Mud brickeachESTIMATED | $0.04 – $0.1 | 60% | |
| Structural timber (cypress, pine)per m³ESTIMATED | $240 – $460 | 48% | |
| Profiled galvanised sheetper sheetESTIMATED | $11 – $22 | 50% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9 – $17 | 47% | |
| Roof tile (stone-coated)eachESTIMATED | $0.9 – $2.2 | 59% | |
| Floor tilingper m²ESTIMATED | $7 – $26 | 73% | |
| Tile adhesive (20 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Tile groutper kgESTIMATED | $1.4 – $3.4 | 59% | |
| Emulsion paint (20 L tin)per tinESTIMATED | $28 – $70 | 60% | |
| Polythene damp-proof membraneper m²ESTIMATED | $0.5 – $1.2 | 58% | |
| Damp-proof course rollper linear metreESTIMATED | $0.9 – $2.2 | 59% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8 – $16 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2 – $5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $1.9 – $4.2 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5 – $12 | 58% | |
| Plasterboardper m²ESTIMATED | $6 – $16 | 63% | |
| Skirtingper metreESTIMATED | $2.2 – $7 | 69% | |
| Metal door with frameper doorESTIMATED | $65 – $180 | 64% | |
| Timber door with frameper doorESTIMATED | $40 – $150 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $75 – $170 | 56% | |
| Louvre windowper m²ESTIMATED | $25 – $60 | 58% | |
| Burglar barper m²ESTIMATED | $22 – $60 | 63% | |
| Stair balustradeper metreESTIMATED | $35 – $130 | 73% | |
| Gutterper metreESTIMATED | $5.5 – $15 | 63% | |
| Rainwater downpipeper metreESTIMATED | $3.5 – $11 | 68% | |
| Supply pipeworkper metreESTIMATED | $1.8 – $5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3 – $9 | 67% | |
| Plumbing point (WC + basin)per pointESTIMATED | $130 – $210 | 38% | |
| Sanitary wareper setESTIMATED | $90 – $320 | 72% | |
| Electrical pointper pointESTIMATED | $7 – $12 | 42% | |
| Distribution board, per wayper wayESTIMATED | $11 – $32 | 66% | |
| Earth electrodeper installationESTIMATED | $42 – $130 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $4.5 – $12 | 63% | |
| Storage tank, per litreper litreESTIMATED | $0.06 – $0.2 | 70% | |
| Submersible pumpeachESTIMATED | $140 – $550 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $90 – $300 | 70% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.2 – $3.2 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $2.8 – $8.5 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $90 – $280 | 68% | |
| Generator, per kVAper kVAESTIMATED | $190 – $1,250 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.7 – $1.35 | 48% | |
| Battery, per nominal kWhper kWhESTIMATED | $150 – $380 | 61% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $70 – $150 | 53% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $160 – $350 | 54% | |
| Labourerper daySOURCED | $5.7 – $9 | 37% | |
| Masonper dayESTIMATED | $11 – $20 | 45% | |
| Carpenter / formworkerper dayESTIMATED | $11 – $20 | 45% | |
| Steelfixerper dayESTIMATED | $11 – $20 | 45% | |
| Electricianper dayESTIMATED | $13 – $24 | 46% | |
| Plumberper dayESTIMATED | $13 – $24 | 46% | |
| Painterper dayESTIMATED | $8 – $14 | 43% | |
| Tilerper dayESTIMATED | $11 – $20 | 45% | |
| Site foremanper dayESTIMATED | $20 – $38 | 47% |
96 lines compared of 97 the pack carries · XOF · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $18 – $57.8 | 69% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $3.5 – $9.8 | 64% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $7 – $24.8 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $1.3 – $4.1 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $4.5 – $16 | 72% | |
| Exterior paint (20 L drum)per drumESTIMATED | $39 – $94 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $21 – $56 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $8 – $35 | 77% | |
| Electrical point, surface mountedper pointESTIMATED | $6 – $10 | 40% | |
| Ridge capping (pre-folded)per metreESTIMATED | $6 – $11 | 45% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $10 – $22 | 55% | |
| Grey cement (50 kg bag)per bagSOURCED | $5.92 – $6.5 | 9% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $0.83 – $3 | 72% | |
| Slab proppingper m² of soffitDERIVED | $1.24 – $4.17 | 70% | |
| Setting outper metre of perimeterDERIVED | $0.41 – $1.5 | 73% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $0.62 – $2.5 | 75% | |
| Hand excavation, ordinary groundper m³DERIVED | $1.98 – $5 | 60% | |
| Washed crushed sand (0/5)per m³DERIVED | $18 – $36 | 50% | |
| Dune or river sandper m³ESTIMATED | $12 – $24 | 50% | |
| Crushed basaltper m³ESTIMATED | $20 – $38 | 47% | |
| Rubble stoneper m³ESTIMATED | $14 – $27 | 48% | |
| Reinforcement barper tonneESTIMATED | $600 – $980 | 39% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $780 – $1,280 | 39% | |
| Cement block 15 × 20 × 40eachDERIVED | $0.5 – $0.78 | 36% | |
| Cement block 10 × 20 × 40eachDERIVED | $0.35 – $0.53 | 34% | |
| Cement block 20 × 20 × 40eachDERIVED | $0.78 – $1.15 | 32% | |
| Half block 15 × 20 × 20eachDERIVED | $0.3 – $0.47 | 36% | |
| Half block 20 × 20 × 20eachDERIVED | $0.47 – $0.69 | 32% | |
| Hollow block 25 × 20 × 40eachDERIVED | $0.88 – $1.3 | 32% | |
| Solid block 15 × 20 × 40eachDERIVED | $0.82 – $1.25 | 34% | |
| Stabilised compressed earth blockeachESTIMATED | $0.2 – $0.5 | 60% | |
| Fired brickeachESTIMATED | $0.07 – $0.5 | 86% | |
| Mud brickeachESTIMATED | $0.04 – $0.1 | 60% | |
| Structural timberper m³ESTIMATED | $260 – $480 | 46% | |
| Galvanised sheet (2.40 × 0.90 m)per sheetESTIMATED | $12 – $22 | 45% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $9 – $16 | 44% | |
| Roof tileeachESTIMATED | $0.7 – $1.6 | 56% | |
| Floor tilingper m²ESTIMATED | $7 – $26 | 73% | |
| Tile adhesive (25 kg bag)per bagESTIMATED | $5 – $12 | 58% | |
| Tile groutper kgESTIMATED | $1.5 – $3.5 | 57% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $30 – $70 | 57% | |
| Polythene damp-proof membrane (300 µm)per m²ESTIMATED | $0.5 – $1.2 | 58% | |
| Damp-proof course roll (23 cm)per linear metreESTIMATED | $0.9 – $2.3 | 61% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $8 – $16 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $2 – $5 | 60% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2 – $4.4 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $5 – $12 | 58% | |
| Plasterboard 12.5 mmper m²ESTIMATED | $7 – $17 | 59% | |
| Skirtingper metreESTIMATED | $2.5 – $8 | 69% | |
| Metal door with frameper doorESTIMATED | $70 – $190 | 63% | |
| Timber door with frameper doorESTIMATED | $45 – $160 | 72% | |
| Glazed aluminium windowper m²ESTIMATED | $80 – $180 | 56% | |
| Louvre (naco) windowper m²ESTIMATED | $30 – $70 | 57% | |
| Burglar barper m²ESTIMATED | $24 – $65 | 63% | |
| Stair balustradeper metreESTIMATED | $38 – $140 | 73% | |
| Gutterper metreESTIMATED | $6 – $16 | 63% | |
| Rainwater downpipeper metreESTIMATED | $4 – $12 | 67% | |
| Supply pipework (PPR ø 25)per metreESTIMATED | $2 – $5.5 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $3.5 – $10 | 65% | |
| Plumbing point (WC + basin)per pointESTIMATED | $150 – $230 | 35% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $100 – $340 | 71% | |
| Electrical point (socket or light)per pointESTIMATED | $8 – $13 | 38% | |
| Distribution board, per wayper wayESTIMATED | $12 – $34 | 65% | |
| Earth electrodeper installationESTIMATED | $45 – $140 | 68% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $5 – $13 | 62% | |
| Storage tank, per litreper litreESTIMATED | $0.08 – $0.26 | 69% | |
| Submersible pumpeachESTIMATED | $150 – $600 | 75% | |
| Tank tower, per metre of heightper metreESTIMATED | $100 – $340 | 71% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $1.3 – $3.5 | 63% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $3 – $9 | 67% | |
| Instantaneous gas water heatereachESTIMATED | $100 – $300 | 67% | |
| Generator, per kVAper kVAESTIMATED | $190 – $1,250 | 85% | |
| Solar PV, per Wpper WpESTIMATED | $0.75 – $1.4 | 46% | |
| Battery, per nominal kWhper kWhESTIMATED | $160 – $400 | 60% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $60 – $130 | 54% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $140 – $320 | 56% | |
| Labourerper daySOURCED | $4.95 – $7.5 | 34% | |
| Masonper dayESTIMATED | $10 – $18 | 44% | |
| Carpenter / formworkerper dayESTIMATED | $10 – $18 | 44% | |
| Steelfixerper dayESTIMATED | $10 – $18 | 44% | |
| Electricianper dayESTIMATED | $12 – $21 | 43% | |
| Plumberper dayESTIMATED | $12 – $21 | 43% | |
| Painterper dayESTIMATED | $7 – $13 | 46% | |
| Tilerper dayESTIMATED | $10 – $18 | 44% | |
| Site foremanper dayESTIMATED | $18 – $32 | 44% |
96 lines compared of 97 the pack carries · ZAR · August 25, 2026
| Material | Range | By city | Spread |
|---|---|---|---|
| Initial verification, per circuit (IEC 60364-6)per circuitESTIMATED | $4 – $12 | 67% | |
| Isolation valve, per fixtureper valveESTIMATED | $6 – $18 | 67% | |
| Wall copingper metreESTIMATED | $6 – $16 | 63% | |
| Damp-proof courseper metreESTIMATED | $1.2 – $3.5 | 66% | |
| Gate lock and drop boltper setESTIMATED | $60 – $200 | 70% | |
| Formwork, per m² of contact areaper m² formedESTIMATED | $4 – $11 | 64% | |
| Binding wire (for tying reinforcement)per kgESTIMATED | $1.5 – $3.5 | 57% | |
| Weep hole (75 mm PVC sleeve through the wall)per weep holeESTIMATED | $2 – $7 | 71% | |
| Filter fabric (behind the wall)per m²ESTIMATED | $1.2 – $3.5 | 66% | |
| Concrete curing (sheeting and water, 7 days)per m² of surfaceESTIMATED | $0.6 – $1.6 | 63% | |
| Movement joint (backer rod and sealant)per metreESTIMATED | $3 – $8 | 63% | |
| Consumer unit, per way (three phase)per wayESTIMATED | $42 – $119 | 65% | |
| Supply cable (3 × 10 mm²)per metreESTIMATED | $6.3 – $16.5 | 62% | |
| Copper supply pipe (ø 22)per metreESTIMATED | $14 – $49.5 | 72% | |
| Pressure PVC supply pipe (ø 25)per metreESTIMATED | $2.6 – $8.2 | 68% | |
| Stair nosing (aluminium or PVC)per metreESTIMATED | $6.3 – $22 | 71% | |
| Exterior paint (20 L drum)per drumESTIMATED | $72 – $176 | 59% | |
| Primer or sealer (20 L drum)per drumESTIMATED | $38 – $104 | 63% | |
| Door ironmongery (lock, handle, 3 hinges)per setESTIMATED | $14 – $62 | 77% | |
| Electrical point, surface mountedper pointESTIMATED | $18 – $36 | 50% | |
| Ridge capping (pre-folded)per metreESTIMATED | $11 – $21 | 48% | |
| Roofing fixings (box of 100)per box of 100ESTIMATED | $18 – $42 | 57% | |
| Grey cement (50 kg bag)per bagSOURCED | $5.57 – $6.19 | 10% | |
| Scaffolding, erect and hireper m² of elevationDERIVED | $2.5 – $8.8 | 72% | |
| Slab proppingper m² of soffitDERIVED | $3.75 – $12.22 | 69% | |
| Setting outper metre of perimeterDERIVED | $1.25 – $4.4 | 72% | |
| Mixing water, deliveredper m³ of concrete or mortarESTIMATED | $1.88 – $7.33 | 74% | |
| Hand excavation, ordinary groundper m³DERIVED | $6 – $14.67 | 59% | |
| Washed crushed sand (0/5)per m³DERIVED | $33 – $63 | 48% | |
| River sandper m³ESTIMATED | $22 – $42 | 48% | |
| Crushed stone (19 mm)per m³ESTIMATED | $28 – $52 | 46% | |
| Rubble stoneper m³ESTIMATED | $20 – $38 | 47% | |
| Reinforcement barper tonneESTIMATED | $780 – $1,250 | 38% | |
| Steel section (IPE, HEA)per tonneESTIMATED | $950 – $1,500 | 37% | |
| Concrete block 190 mmeachDERIVED | $0.95 – $1.6 | 41% | |
| Concrete block 90 mmeachDERIVED | $0.62 – $1.05 | 41% | |
| Concrete block 190 mmeachDERIVED | $0.95 – $1.6 | 41% | |
| Half block 15 × 20 × 20eachDERIVED | $0.48 – $0.81 | 41% | |
| Half block 20 × 20 × 20eachDERIVED | $0.57 – $0.96 | 41% | |
| Concrete block 240 mmeachDERIVED | $1.2 – $2 | 40% | |
| Solid block 140 mmeachDERIVED | $1.15 – $1.9 | 39% | |
| Stabilised compressed earth blockeachESTIMATED | $0.5 – $1.1 | 55% | |
| Fired brick (imperial or maxi)eachESTIMATED | $0.15 – $0.45 | 67% | |
| Mud brickeachESTIMATED | $0.08 – $0.2 | 60% | |
| Structural timber (SA pine, treated)per m³ESTIMATED | $320 – $560 | 43% | |
| Profiled sheet (IBR, 0.5 mm)per sheetESTIMATED | $22 – $42 | 48% | |
| Fibre-cement corrugated sheetper sheetESTIMATED | $18 – $32 | 44% | |
| Concrete roof tileeachESTIMATED | $0.75 – $1.6 | 53% | |
| Floor tilingper m²ESTIMATED | $9 – $40 | 78% | |
| Tile adhesive (20 kg bag)per bagESTIMATED | $6 – $14 | 57% | |
| Tile groutper kgESTIMATED | $2 – $4.5 | 56% | |
| Acrylic paint (20 L tin)per tinESTIMATED | $55 – $130 | 58% | |
| Polythene damp-proof membrane (250 µm)per m²ESTIMATED | $0.8 – $1.8 | 56% | |
| Damp-proof course rollper linear metreESTIMATED | $1.3 – $3 | 57% | |
| SBS bitumen membrane 4 mmper m²ESTIMATED | $11 – $22 | 50% | |
| Liquid waterproofing (per coat)per m² per coatESTIMATED | $3 – $7 | 57% | |
| Cementitious tanking slurry, per kgper kgESTIMATED | $2.5 – $5.5 | 55% | |
| PVC ceiling panellingper m²ESTIMATED | $9 – $20 | 55% | |
| Plasterboard (Rhinoboard)per m²ESTIMATED | $12 – $28 | 57% | |
| Skirtingper metreESTIMATED | $3.5 – $11 | 68% | |
| Metal door with frameper doorESTIMATED | $120 – $340 | 65% | |
| Timber door with frameper doorESTIMATED | $75 – $280 | 73% | |
| Glazed aluminium windowper m²ESTIMATED | $130 – $300 | 57% | |
| Louvre windowper m²ESTIMATED | $60 – $130 | 54% | |
| Burglar barper m²ESTIMATED | $35 – $90 | 61% | |
| Stair balustradeper metreESTIMATED | $70 – $220 | 68% | |
| Gutterper metreESTIMATED | $9 – $24 | 63% | |
| Rainwater downpipeper metreESTIMATED | $6 – $16 | 63% | |
| Supply pipework (PEX or copper)per metreESTIMATED | $4 – $11 | 64% | |
| Waste pipework (PVC ø 110)per metreESTIMATED | $6 – $15 | 60% | |
| Plumbing point (WC + basin)per pointESTIMATED | $320 – $620 | 48% | |
| Sanitary ware (WC, basin, taps)per setESTIMATED | $180 – $750 | 76% | |
| Electrical point (socket or light)per pointESTIMATED | $22 – $45 | 51% | |
| Distribution board, per wayper wayESTIMATED | $28 – $70 | 60% | |
| Earth electrodeper installationESTIMATED | $110 – $300 | 63% | |
| Supply cable (4 × 10 mm²)per metreESTIMATED | $9 – $22 | 59% | |
| Storage tank, per litreper litreESTIMATED | $0.12 – $0.3 | 60% | |
| Submersible pumpeachESTIMATED | $300 – $1,100 | 73% | |
| Tank tower, per metre of heightper metreESTIMATED | $180 – $520 | 65% | |
| Electric water heater, per litreper litre of capacityESTIMATED | $2.2 – $5 | 56% | |
| Solar water heater, per litreper litre of capacityESTIMATED | $5 – $13 | 62% | |
| Instantaneous gas water heatereachESTIMATED | $180 – $520 | 65% | |
| Generator, per kVAper kVAESTIMATED | $260 – $1,400 | 81% | |
| Solar PV, per Wpper WpESTIMATED | $0.9 – $1.8 | 50% | |
| Battery, per nominal kWhper kWhESTIMATED | $220 – $480 | 54% | |
| Hand-drilled borehole, per metre (to 40 m)per metreESTIMATED | $90 – $190 | 53% | |
| Rig-drilled borehole, per metre (beyond 40 m)per metreESTIMATED | $200 – $420 | 52% | |
| Labourerper daySOURCED | $15 – $22 | 32% | |
| Bricklayerper dayESTIMATED | $26 – $45 | 42% | |
| Carpenter / shuttering handper dayESTIMATED | $26 – $45 | 42% | |
| Steelfixerper dayESTIMATED | $26 – $45 | 42% | |
| Registered electricianper dayESTIMATED | $45 – $90 | 50% | |
| Registered plumber (PIRB)per dayESTIMATED | $45 – $90 | 50% | |
| Painterper dayESTIMATED | $20 – $34 | 41% | |
| Tilerper dayESTIMATED | $26 – $45 | 42% | |
| Site foremanper dayESTIMATED | $55 – $110 | 50% |
Because it would have to be invented. This product does not yet keep a price history, and a simulated line on the page built to show the data off would undo the one thing every other page promises: every figure carries a source you can open. The columns below are what is actually known, and the chart goes in when there is a history to draw.